Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Michael Hassoun
Observed name:
M. Hassoun
Institution:
Ariel University
Observed institutions:
Ben-Gurion University of the Negev,
Technion – Israel Institute of Technology,
University of Michigan,
Ariel University
ORCID:
0000-0002-3926-261X
Observed ORCID:
0000-0002-3926-261X
OpenAlex ID:
A5010563443
Cycle-Time Key Factor Identification and Prediction in Semiconductor Manufacturing Using Machine Learning and Data Mining
2011
·
Yair Meidan
, Boaz Lerner
, et al.
·
IEEE Transactions on Semiconductor Manufacturing
·
96
SMT2020—A Semiconductor Manufacturing Testbed
2020
·
Denny Kopp
, Michael Hassoun
, et al.
·
IEEE Transactions on Semiconductor Manufacturing
·
62
A New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing
2019
·
Michael Hassoun
, Denny Kopp
, et al.
·
Winter Simulation Conference
·
19
Equilibria, Stability, and Transients in Re-Entrant Lines Under FBFS and LBFS Dispatch and Constant Release
2012
·
Chao-Bo Yan
, Michael Hassoun
, et al.
·
IEEE Transactions on Semiconductor Manufacturing
·
17
The single line moving target traveling salesman problem with release times
2019
·
Michael Hassoun
, Shraga Shoval
, et al.
·
Annals of Operations Research
·
16
Integrating Critical Queue Time Constraints Into SMT2020 Simulation Models
2020
·
Denny Kopp
, Michael Hassoun
, et al.
·
Winter Simulation Conference
·
15
The newsvendor problem with GHG emissions from waste disposal under cap-and-trade regulation
2024
·
Jean-Philippe Gayon
, Michael Hassoun
·
International Journal of Production Research
·
11
PDF
Towards a new simulation testbed for semiconductor manufacturing
2017
·
Michael Hassoun
, Adar Kalir
·
Winter Simulation Conference
·
11
Setting defect charts control limits to balance cycle time and yield for a tandem production line
2014
·
Miri Gilenson
, Michael Hassoun
, et al.
·
Computers & Operations Research
·
11
On Improving the Predictability of Cycle Time in an NVM Fab by Correct Segmentation of the Process
2013
·
Michael Hassoun
·
IEEE Transactions on Semiconductor Manufacturing
·
10
Identification and Cost Estimation of WIP Bubbles in a Fab
2008
·
Michael Hassoun
, Gad Rabinowitz
, et al.
·
IEEE Transactions on Semiconductor Manufacturing
·
9
Hunting Down the Bubble Makers in Fabs
2010
·
M. Hassoun
, G. Rabinowitz
·
IEEE Transactions on Semiconductor Manufacturing
·
8
Data Mining for Cycle Time Key Factor Identification and Prediction in Semiconductor Manufacturing
2009
·
Y. Meidan
, B. Lerner
, et al.
·
IFAC Proceedings Volumes
·
8
On the Benefits of Providing Timely Information in Ticket Queues with Balking and Calling Times
2021
·
Gabi Hanukov
, Michael Hassoun
, et al.
·
Mathematics
·
6
PDF
Allocating metrology capacity to multiple heterogeneous machines
2016
·
Stéphane Dauzère-Pérès
, Michael Hassoun
, et al.
·
International Journal of Production Research
·
6
On the right combination of altruism and randomness in the motion of homogeneous distributed autonomous agents
2021
·
Michael Hassoun
, Evgeny Kagan
·
Natural Computing
·
4
On the importance of variability when managing metrology capacity
2019
·
Stéphane Dauzère-Pérès
, Michael Hassoun
·
European Journal of Operational Research
·
4
A Lagrangian heuristic for minimising risk using multiple heterogeneous metrology tools
2019
·
Stéphane Dauzère-Pérès
, Michael Hassoun
, et al.
·
International Journal of Production Research
·
2
Optimizing capacity assignment of multiple identical metrology tools
2016
·
Stephane Dauzere-Peres
, Michael Hassoun
, et al.
·
Winter Simulation Conference
·
2
A Novel Dynamic Process Control Scheme to Improve Cycle Time in Fabs
2016
·
Michael Hassoun
·
IEEE Transactions on Semiconductor Manufacturing
·
2
Setting quality control requirements to balance between Cycle Time and Yield in a semiconductor production line
2014
·
Miri Gilenson
, Michael Hassoun
, et al.
·
Winter Simulation Conference
·
2
Classification and cost estimation of WIP bubbles in a fab
2005
·
M. Hassoun
, G. Rabinowitz
, et al.
·
2
Prediction of product layer cycle time using data mining
2013
·
Michael Hassoun
·
Winter Simulation Conference
·
1
Setting quality control requirements to balance cycle time and yield — The single machine case
2012
·
Miri Gilenson
, Liron Yedidsion
, et al.
·
Winter Simulation Conference
·
1
Security agent allocation to partially observable heterogeneous frontier segments
2011
·
Michael Hassoun
, Gad Rabinowitz
, et al.
·
IIE Transactions
·
1
Show more works
View as search
Works count:
30
Citation count:
326
H-index:
10
I10-index:
10
Year
Topic
Type