Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Amin Mousavi
Observed names:
A. Mousavi,
Amin Alah Mousavi,
Mousavi, Amin
Institution:
Tarbiat Modares University
Observed institutions:
Commonwealth Scientific and Industrial Research Organisation,
Tarbiat Modares University,
Queensland University of Technology,
Mining3
ORCID:
0000-0002-5436-696X
Observed ORCID:
0000-0002-5436-696X
OpenAlex ID:
A5012608872
Open-pit block sequencing optimization: A mathematical model and solution technique
2016
·
Amin Mousavi
, Erhan Kozan
, et al.
·
Engineering Optimization
·
64
PDF
Prediction of Dust Emission Due to Open Pit Mine Blasting Using a Hybrid Artificial Neural Network
2021
·
Shahab Hosseini
, Masoud Monjezi
, et al.
·
Natural Resources Research
·
57
Mine-to-crusher policy: Planning of mine blasting patterns for environmentally friendly and optimum fragmentation using Monte Carlo simulation-based multi-objective grey wolf optimization approach
2022
·
Shahab Hosseini
, Amin Mousavi
, et al.
·
Resources Policy
·
51
Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions
2020
·
Farzad Sotoudeh
, Micah Nehring
, et al.
·
Resources Policy
·
42
Prediction of blast-induced dust emissions in surface mines using integration of dimensional analysis and multivariate regression analysis
2022
·
Shahab Hosseini
, Amin Mousavi
, et al.
·
Arabian Journal of Geosciences
·
38
Improved mine waste dump planning through integration of geochemical and mineralogical data and mixed integer programming: Reducing acid rock generation from mine waste
2022
·
Vahid Vaziri
, Ahmad Reza Sayadi
, et al.
·
Journal of Environmental Management
·
37
Comparative analysis of three metaheuristics for short-term open pit block sequencing
2016
·
Amin Mousavi
, Erhan Kozan
, et al.
·
Journal of Heuristics
·
36
Mathematical modeling for optimized mine waste rock disposal: Establishing more effective acid rock drainage management
2020
·
Vahid Vaziri
, Ahmad Reza Sayadi
, et al.
·
Journal of Cleaner Production
·
28
Optimisation of production planning for an innovative hybrid underground mining method
2019
·
Amin Mousavi
, Ewan Sellers
·
Resources Policy
·
27
A novel cut-off grade method for increasing the sustainability of underground metalliferous mining operations
2021
·
Farzad Sotoudeh
, Micah Nehring
, et al.
·
Minerals Engineering
·
23
Automatic detection of rock boundaries using a hybrid recurrence quantification analysis and machine learning techniques
2022
·
Keyumars Anvari
, Amin Mousavi
, et al.
·
Bulletin of Engineering Geology and the Environment
·
18
Open pit optimization in 3D using a new artificial neural network
2011
·
Ahmad Reza Sayadi
, Nader Fathianpour
, et al.
·
Archives of Mining Sciences
·
17
Using Rock Geomechanical Characteristics to Estimate Bond Work Index for Mining Production Blocks
2021
·
Arshad Ranjbar
, Amin Mousavi
, et al.
·
Mining Metallurgy & Exploration
·
12
Determination of sublevel stoping layout using a network flow algorithm and the MRMR classification system
2022
·
Ahmadreza Esmaeili
, Jafar Khademi Hamidi
, et al.
·
Resources Policy
·
9
Development of a MIP model to maximize NPV and minimize adverse environmental impact—a heuristic approach
2020
·
Tayebeh Ramezanalizadeh
, Masoud Monjezi
, et al.
·
Environmental Monitoring and Assessment
·
9
A new mathematical model for the optimization of block aggregation in open pit mines
2022
·
Younes Aalian
, Amin Mousavi
, et al.
·
Mining Technology Transactions of the Institutions of Mining and Metallurgy
·
8
Detailed Rock Mass Characterization - A Prerequisite for Successful Differential Blast Design
2019
·
Ewan Sellers
, Ebrahim Fathi Salmi
, et al.
·
7
New MIP Model for Short-term Planning in Open-Pit Mines Considering Loading Machine Performance: A case study in Iran
2023
·
Zohreh Nabavi
, Amin Mousavi
, et al.
·
International Journal of Mining and Mineral Engineering
·
5
A comparative study of kriging and simulation-based methods in classifying ore and waste blocks
2016
·
Amin Mousavi
, Ahmad Reza Sayadi
, et al.
·
Arabian Journal of Geosciences
·
5
A Genetic algorithm scheme for large scale open-pit mine production scheduling
2023
·
Nooshin Azadi
, Hossein Mirzaei-Nasirabad
, et al.
·
Mining Technology Transactions of the Institutions of Mining and Metallurgy
·
4
A New Mathematical Formulation for Underground Cut-off Grade Determination in the Presence of Pre-concentration Systems
2021
·
Farzad Sotoudeh
, Micah Nehring
, et al.
·
Natural Resources Research
·
4
Integrated approach to optimize open-pit mine block sequencing
2014
·
Amin Mousavi
, Erhan Kozan
, et al.
·
Science & Engineering Faculty
·
4
Strategic Long-Term Planning for Sublevel Caving: A Unified Mixed-Integer-Linear Programming Framework for Development, Ventilation, Production Scheduling, and Stockpile Management
2025
·
Soroush Khazaei
, Amin Mousavi
, et al.
·
Mining Metallurgy & Exploration
·
3
Case study of an equivalent annual cost model for economic lifetime for construction vehicles under cost uncertainty
2022
·
Mohamad Zarean
, Ahmad Reza Sayadi
, et al.
·
The Engineering Economist
·
3
Highest-Level Implementation of Push–Relabel Algorithm to Solve Ultimate Pit Limit Problem
2021
·
Maryam Talaei
, Amin Mousavi
, et al.
·
Journal of mining and environment
·
3
Show more works
View as search
Works count:
41
Citation count:
540
H-index:
12
I10-index:
14
Year
Topic
Type