Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Aref Alipour
Observed name:
A. Alipour
Institution:
An-Najah National University
Observed institutions:
Urmia University of Technology,
An-Najah National University,
University of Wollongong,
University of Tehran
ORCID:
0000-0003-0946-3477
Observed ORCID:
0000-0003-0946-3477
OpenAlex ID:
A5017485974
Production scheduling of open-pit mines using genetic algorithm: a case study
2019
·
Aref Alipour
, Ali Asghar Khodaiari
, et al.
·
International Journal of Management Science and Engineering Management
·
33
An integrated approach to open-pit mines production scheduling
2021
·
Aref Alipour
, Ali Asghar Khodaiari
, et al.
·
Resources Policy
·
27
Predicting the Contribution of Mining Sector to the Gross Domestic Product (GDP) Index Utilizing Heuristic Approaches
2021
·
Shirin Jahanmiri
, Mostafa Asadizadeh
, et al.
·
Applied Artificial Intelligence
·
19
PDF
Application of ANNs and MVLRA for Estimation of Specific Charge in Small Tunnel
2011
·
A. Alipour
, A. Jafari
, et al.
·
International Journal of Geomechanics
·
18
Fuzzy modeling approaches for the prediction of maximum charge per delay in surface mining
2011
·
A. Alipour
, M. Ashtiani
·
International Journal of Rock Mechanics and Mining Sciences
·
17
Assessing the System Vibration of Circular Sawing Machine in Carbonate Rock Sawing Process Using Experimental Study and Machine Learning
2021
·
Reza Mikaeil
, Mojtaba Mokhtarian
, et al.
·
Geotechnical and Geological Engineering
·
16
PDF
A genetic algorithm approach for open-pit mine production scheduling
2017
·
Aref Alipour
, Ali Asghar khodaiari
, et al.
·
DOAJ (DOAJ: Directory of Open Access Journals)
·
14
An Application of Fuzzy Sets to the Blastability Index (BI) Used in Rock Engineering
2018
·
Aref Alipour
, Mojtaba Mokharian
, et al.
·
Periodica Polytechnica Civil Engineering
·
13
Uncertain production scheduling optimization in open-pit mines and its ellipsoidal robust counterpart
2018
·
Aref Alipour
, Ali Asghar Khodaiari
, et al.
·
International Journal of Management Science and Engineering Management
·
13
RSM-Based Model to Estimate the V-Cut Drill and Blast Pattern Specific Charge in Rock Tunneling
2021
·
A. Alipour
, M. Mokhtarian
·
International Journal of Geomechanics
·
11
Ground Vibration Due to Blasting in Dam and Hydropower Projects
2020
·
Hojjat Hosseinzadeh Gharehgheshlag
, Aref Alipour
·
Rudarsko-geološko-naftni zbornik
·
11
PDF
Artificial Neural Network or Empirical Criteria? A Comparative Approach in Evaluating Maximum Charge per Delay in Surface Mining - Sungun Copper Mine
2012
·
A. Alipour
, M. Mokhtarian
, et al.
·
Journal of the Geological Society of India
·
10
The Effect of Central Flaw on the Unconfined Strength of Rock-like Specimens: An Intelligent Approach
2022
·
Mostafa Asadizadeh
, Javad Karimi
, et al.
·
Iranian Journal of Science and Technology Transactions of Civil Engineering
·
7
Support Vector Machines for the Estimation of Specific Charge in Tunnel Blasting
2021
·
Aref Alipour
, Mojtaba Mokhtarian-Asl
, et al.
·
Periodica Polytechnica Civil Engineering
·
6
Modeling and prediction of time-series of monthly copper prices
2019
·
Aref Alipour
, Ali Asghar Khodayari
, et al.
·
DOAJ (DOAJ: Directory of Open Access Journals)
·
6
Geological Modeling and Short-term Production Planning of Dimension Stone Quarries Based on Market Demand
2012
·
J. Abdollahisharif
, E. Bakhtavar
, et al.
·
Journal of the Geological Society of India
·
6
Rock fragment size prediction using RSM in bench blasting: a focus on the influencing factors and their interactions
2023
·
Aref Alipour
, Mostafa Asadizadeh
·
Arabian Journal of Geosciences
·
5
Rock Mass Excavatability Estimation Using Artificial Neural Network
2011
·
Sajad Haghir Chehreghani
, Aref Alipour
, et al.
·
Journal of the Geological Society of India
·
4
A nonlinear model to estimate vibration frequencies in surface mines
2020
·
Mojtaba Mokhtarian Asl
, Aref Alipour
·
DOAJ (DOAJ: Directory of Open Access Journals)
·
3
Application of Benford’s Law in Analyzing Geotechnical Data
2019
·
Aref Alipour
, Sharareh Alipour
·
DOAJ (DOAJ: Directory of Open Access Journals)
·
3
Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach
2017
·
Aref Alipour
, Ali Asghar Khodaiari
, et al.
·
Journal of mining and environment
·
3
Estimation of blast-induced ground vibrations: a non-linear model based on the imperialist competitive algorithm
2022
·
Aref Alipour
, Mojtaba Mokhtarian
·
Arabian Journal of Geosciences
·
2
The effect of loading contact angle on the tensile behavior of rock disks
2025
·
Mostafa Asadizadeh
, Saeed Khosravi
, et al.
·
Rock mechanics letters.
·
1
PDF
Prediction of Specific Charge In Tunnel Blasting Using ANNs
2009
·
Ahmad Jafari
, Mohammad Farouq Hossaini
, et al.
·
ISRM International Symposium on Rock Mechanics - SINOROCK 2009
·
1
Experimental Investigation of Some Mechanical and Physical Properties of SIFCON Concrete Incorporating Bauxite as a Mining-Derived Waste Material
2026
·
Hiba Tarek Mezher
, Hojjat Hosseinzadeh Gharehgheshlagh
, et al.
·
An-Najah University Journal for Research - A (Natural Sciences)
PDF
Show more works
View as search
Works count:
33
Citation count:
249
H-index:
11
I10-index:
12
Year
Topic
Type