Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Ji Ung Sun
Observed names:
J. U. Sun,
J.U. Sun,
Ji Sun,
Sun Ji Ung
Institution:
Hankuk University of Foreign Studies
Observed institutions:
Korea Advanced Institute of Science and Technology,
LG (South Korea),
Hankuk University of Foreign Studies
ORCID:
0000-0002-6586-9116
Observed ORCID:
0000-0002-6586-9116
OpenAlex ID:
A5019284500
Production sequencing problem with re-entrant work flows and sequence dependent setup times
1998
·
H. Hwang
, J.U. Sun
·
International Journal of Production Research
·
47
Production sequencing problem with reentrant work flows and sequence dependent setup times
1997
·
Hark Hwang
, Ji Ung Sun
·
Computers & Industrial Engineering
·
28
Bilayer Local Search Enhanced Particle Swarm Optimization for the Capacitated Vehicle Routing Problem
2018
·
A. Ahmed
, Ji Sun
·
Algorithms
·
23
PDF
A genetic algorithm for a re-entrant job-shop scheduling problem with sequence-dependent setup times
2009
·
J. U. Sun
·
Engineering Optimization
·
21
Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times
2001
·
Ji Ung Sun
, Hark Hwang
·
International Journal of Systems Science
·
15
An Endosymbiotic Evolutionary Algorithm for the Hub Location-Routing Problem
2015
·
Ji Ung Sun
·
Mathematical Problems in Engineering
·
12
PDF
A Taguchi Approach to Parameter Setting in a Genetic Algorithm for General Job Shop Scheduling Problem
2007
·
Ji Ung Sun
·
Industrial Engineering & Management Systems
·
11
An Integrated Hub Location and Multi-Depot Vehicle Routing Problem
2013
·
Ji Ung Sun
·
Applied Mechanics and Materials
·
8
A Graph Optimization Algorithm for Warehouses with Middle Cross Aisles
2011
·
Ho Young Jang
, Ji Ung Sun
·
Applied Mechanics and Materials
·
8
An Ant Colony System Hybridized with a Genetic Algorithm for the Capacitated Hub Location Problem
2012
·
Ji Ung Sun
, Dan-Ho Park
·
Lecture notes in computer science
·
6
A novel approach to combine the hierarchical and iterative techniques for solving capacitated location-routing problem
2018
·
A.K.M. Foysal Ahmed
, Ji Ung Sun
·
Cogent Engineering
·
5
An Improved Particle Swarm Optimization Algorithm for the Travelling Salesman Problem
2016
·
A. K. M. Foysal Ahmed
, Ji Ung Sun
·
Advanced Science Letters
·
3
Multi-station Fixture Layout Design Using Simulated Annealing
2004
·
Pansoo Kim
, Ji Ung Sun
·
Management Science and Financial Engineering
·
3
U-line Line Balancing with Simulated Annealing
1996
·
Ji Ung Sun
, Hark Hwang
, et al.
·
Proceedings of the Korean Operations and Management Science Society Conference
·
3
A Two-Step Local Search Enhancement with the Novel Solution Representation for Solving Capacitated Vehicle Routing Problems
2019
·
Asma Ull Hosna
, A. K. M. Foysal Ahmad
, et al.
·
Advanced Science Letters
·
2
An Ant Colony Optimization Algorithm for the Press Shop Scheduling Problem
2013
·
Ji Ung Sun
·
Applied Mechanics and Materials
·
2
A New Solution Representation to Improve the Performance of Meta-Heuristics for Capacitated Vehicle Routing Problem
2017
·
A. K. M. Foysal Ahmed
, Ji Ung Sun
·
Advanced Science Letters
·
1
An Integer Programming Model for the Integrated Hub Location and Multi-Hub Vehicle Routing Problem
2015
·
Ji Ung Sun
·
Advanced Science Letters
·
1
An Endosymbiotic Evolutionary Algorithm for Designing Hub and Spoke Network with Asymmetric Allocation
2014
·
Ji Ung Sun
·
Advanced Science Letters
·
1
A Two-Phase Meta Heuristic Approach to the Location-Routing Problem for Transportation Network Planning
2013
·
Ji Ung Sun
·
Applied Mechanics and Materials
·
1
A Hierarchical Approach to the Capacitated Single Allocation p-Hub Median Problem with Direct Shipment
2012
·
Ji Ung Sun
, Don Ki Baek
·
Applied Mechanics and Materials
·
1
A Combined Meta-Heuristic Approach to Optimize a Hub and Spoke Network Design Problem
2012
·
Ji Ung Sun
·
1
A Comparative Study of Two-phase Heuristic Approaches to General Job Shop Scheduling Problem
2008
·
Ji Ung Sun
·
Industrial Engineering & Management Systems
·
1
Dynamic Programming Approach to a Two Machine Flow Shop Sequencing with Two-Step-Prior-Job Dependent Setup Times
2006
·
Ji Ung Sun
·
Industrial Engineering & Management Systems
·
1
An Effective Taguchi Design For Parameter Tuning in Ant Colony Optimization Applied to the Capacitated Hub Location Problem
2026
·
Ji Ung Sun
·
International Journal of Research and Innovation in Social Science
PDF
Show more works
View as search
Works count:
33
Citation count:
205
H-index:
8
I10-index:
7
Year
Topic
Type