Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Ravi Shankar Kumar
Observed names:
RAVI SHANKAR KUMAR,
Ravi Kumar
Institution:
Bihar Agricultural University
Observed institutions:
Indian Institute of Technology Kharagpur,
Indian Council of Agricultural Research,
National Institute of Technology Agartala,
Bihar Agricultural University
ORCID:
0000-0003-2295-8749
Observed ORCID:
0000-0003-2295-8749
OpenAlex ID:
A5020868136
Multi-objective modeling of production and pollution routing problem with time window: A self-learning particle swarm optimization approach
2015
·
Ravi Shankar Kumar
, Karthik Kondapaneni
, et al.
·
Computers & Industrial Engineering
·
174
Cooperative sustainable supply chain for deteriorating item and imperfect production under different carbon emission regulations
2020
·
Chayanika Rout
, Arjun Paul
, et al.
·
Journal of Cleaner Production
·
121
Integrated optimization of inventory, replenishment and vehicle routing for a sustainable supply chain under carbon emission regulations
2021
·
Chayanika Rout
, Arjun Paul
, et al.
·
Journal of Cleaner Production
·
52
Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system
2014
·
Ravi Shankar Kumar
, M. K. Tiwari
, et al.
·
Journal of Intelligent Manufacturing
·
47
A continuous review production–inventory system in fuzzy random environment: Minmax distribution free procedure
2014
·
Ravi Shankar Kumar
, A. Goswami
·
Computers & Industrial Engineering
·
43
Designing multi-period supply chain network considering risk and emission: a multi-objective approach
2016
·
Ravi Shankar Kumar
, Alok Choudhary
, et al.
·
Annals of Operations Research
·
40
PDF
Mining RBAC Roles under Cardinality Constraint
2010
·
Ravi Kumar
, Shamik Sural
, et al.
·
Lecture notes in computer science
·
37
An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages : a type-2 fuzzy approach
2019
·
Chayanika Rout
, Ravi Shankar Kumar
, et al.
·
OPSEARCH
·
36
A fuzzy random EPQ model for imperfect quality items with possibility and necessity constraints
2015
·
Ravi Shankar Kumar
, A. Goswami
·
Applied Soft Computing
·
34
EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment
2013
·
Ravi Shankar Kumar
, A. Goswami
·
International Journal of Systems Science
·
29
Fuzzy EOQ models with ramp type demand rate, partial backlogging and time dependent deterioration rate
2012
·
Ravi Shankar Kumar
, S.K. De
, et al.
·
International Journal of Mathematics in Operational Research
·
27
A control chart guided maintenance policy selection
2009
·
Suprakash Gupta
, Jhareswar Maiti
, et al.
·
International Journal of Mining Reclamation and Environment
·
22
A bi-objective two-echelon pollution routing problem with simultaneous pickup and delivery under multiple time windows constraint
2021
·
Arjun Paul
, Ravi Shankar Kumar
, et al.
·
OPSEARCH
·
21
Trade-credit modeling for deteriorating item inventory system with preservation technology under random planning horizon
2018
·
Dipana Jyoti Mohanty
, Ravi Shankar Kumar
, et al.
·
Sadhana
·
16
Modelling a type-2 fuzzy inventory system considering items with imperfect quality and shortage backlogging
2018
·
Ravi Shankar Kumar
·
Sadhana
·
11
Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost
2018
·
Dipana Jyoti Mohanty
, Ravi Shankar Kumar
, et al.
·
RAIRO - Operations Research
·
11
An improved inventory model with random review period and temporary price discount for deteriorating items
2015
·
Dipana Jyoti Mohanty
, Ravi Shankar Kumar
, et al.
·
International Journal of Systems Assurance Engineering and Management
·
11
Designing a multi-depot multi-period vehicle routing problem with time window: hybridization of tabu search and variable neighbourhood search algorithm
2021
·
Arjun Paul
, Ravi Shankar Kumar
, et al.
·
Sadhana
·
9
Continuous review inventory system for intuitionistic fuzzy random demand under service level constraint
2022
·
MANDEEP KUMAR
, RAVI SHANKAR KUMAR
, et al.
·
Sadhana
·
8
A two-warehouse inventory model for non-instantaneous deteriorating items over stochastic planning horizon
2016
·
Dipana Jyoti Mohanty
, Ravi Shankar Kumar
, et al.
·
Journal of Industrial and Production Engineering
·
8
Designing a single-vendor and multiple-buyers’ integrated production inventory model for interval type-2 fuzzy demand and fuzzy rule based deterioration
2021
·
Chayanika Rout
, Ravi Shankar Kumar
, et al.
·
RAIRO - Operations Research
·
5
PDF
Domestic Fish Marketing - an Analysis of Fish Markets of Khagaria District
2023
·
Ravi Shankar Kumar
, Kranthi Kumar Dhande
·
JOURNAL OF EXPERIMENTAL ZOOLOGY INDIA
·
3
Productivity, energy use efficiency, economics and CO2 emission from integrated fish-duck farming in floodplain wetland ecosystems of eastern India
2023
·
Ravi Kumar
, M. Monobrullah
, et al.
·
Indian Journal of Fisheries
·
1
PDF
A type-2 fuzzy based hybrid AHP-TODIM MCDM approach for green supplier selection
2023
·
Ravi Shankar Kumar
, Chayanika Rout
, et al.
·
AIP conference proceedings
·
1
Constraints and Opportunities in Tobacco Production: Evidence from Samastipur District of Bihar, India
2026
·
S. M. Rahaman
, Ravi Shankar Kumar
, et al.
·
Archives of Current Research International
Show more works
View as search
Works count:
27
Citation count:
764
H-index:
14
I10-index:
17
Year
Topic
Type