Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Thiago Cantos Lopes
Observed names:
Cantos Lopes, Thiago,
Lopes, Thiago Cantos
Institution:
Universidade Tecnológica Federal do Paraná
Observed institutions:
Institut polytechnique de Grenoble,
Universidade Tecnológica Federal do Paraná,
Centre National de la Recherche Scientifique,
Laboratoire des Sciences pour la Conception, l'Optimisation et la Production,
Université Grenoble Alpes
ORCID:
0000-0003-3541-2788
Observed ORCID:
0000-0003-3541-2788
OpenAlex ID:
A5028108060
Balancing a robotic spot welding manufacturing line: An industrial case study
2017
·
Thiago Cantos Lopes
, C.G.S. Sikora
, et al.
·
European Journal of Operational Research
·
105
Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies
2016
·
Celso Gustavo Stall Sikora
, Thiago Cantos Lopes
, et al.
·
European Journal of Operational Research
·
96
A Benders’ decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem
2019
·
Adalberto Sato Michels
, Thiago Cantos Lopes
, et al.
·
European Journal of Operational Research
·
88
The Robotic Assembly Line Design (RALD) problem: Model and case studies with practical extensions
2018
·
Adalberto Sato Michels
, Thiago Cantos Lopes
, et al.
·
Computers & Industrial Engineering
·
70
An iterative decomposition for asynchronous mixed-model assembly lines: combining balancing, sequencing, and buffer allocation
2019
·
Thiago Cantos Lopes
, Celso Gustavo Stall Sikora
, et al.
·
International Journal of Production Research
·
55
Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization
2019
·
Thiago Cantos Lopes
, Giuliano Vidal Pastre
, et al.
·
Omega
·
53
Balancing and cyclically sequencing synchronous, asynchronous, and hybrid unpaced assembly lines
2018
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
International Journal of Production Economics
·
38
Balancing and cyclical scheduling of asynchronous mixed-model assembly lines with parallel stations
2019
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
Journal of Manufacturing Systems
·
37
An exact method with decomposition techniques and combinatorial Benders’ cuts for the type-2 multi-manned assembly line balancing problem
2020
·
Adalberto Sato Michels
, Thiago Cantos Lopes
, et al.
·
Operations Research Perspectives
·
34
PDF
A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines
2019
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
Computers & Operations Research
·
33
Mixed-model assembly lines balancing with given buffers and product sequence: model, formulation comparisons, and case study
2017
·
Thiago Cantos Lopes
, Celso Gustavo Stall Sikora
, et al.
·
Annals of Operations Research
·
33
Integer based formulation for the simple assembly line balancing problem with multiple identical tasks
2016
·
Celso Gustavo Stall Sikora
, Thiago Cantos Lopes
, et al.
·
Computers & Industrial Engineering
·
18
Assembly line balancing with fractional task allocations
2021
·
Thiago Cantos Lopes
, Nadia Brauner
, et al.
·
International Journal of Production Research
·
17
Assembly line balancing for two cycle times: Anticipating demand fluctuations
2021
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
Computers & Industrial Engineering
·
11
Genetic algorithm for type-2 assembly line balancing
2015
·
Celso Gustavo Stall Sikora
, Thiago Cantos Lopes
, et al.
·
IEEE Latin American Conference on Computational Intelligence (LA-CCI)
·
9
A method to balancing robotic mixed-model assembly lines: Practical constraints, computational challenges, and performance estimation
2024
·
Daniel Schibelbain
, Thiago Cantos Lopes
, et al.
·
Computers & Industrial Engineering
·
8
A note to: A hybrid algorithm for allocating tasks, operators, and workstations in multi-manned assembly lines
2019
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
Journal of Manufacturing Systems
·
8
Balancing-sequencing paced assembly lines: a multi-objective mixed-integer linear case study
2022
·
Thiago Cantos Lopes
, Adalberto Sato Michels
, et al.
·
International Journal of Production Research
·
6
Optimally solving multi-objective MILP problems with part-wise continuous Pareto fronts
2020
·
Cantos Lopes, Thiago
, Brauner, Nadia
, et al.
·
HAL
·
4
Cyclical scheduling and assembly line balancing
2021
·
Thiago Cantos Lopes
·
1
Balanceamento De Uma Linha De Manufatura Robotizada Com Características Simétricas Por Meio De Programação Matemática
2018
·
Rafael Gobbi Molina
, Thiago Cantos Lopes
, et al.
·
Anais do Simpósio Brasileiro de Pesquisa Operacional
·
1
PDF
Balancing optimization of robotic welding lines: model and case study
2017
·
Thiago Cantos Lopes
·
Americanae (AECID Library)
·
1
Balancing-sequencing paced assembly lines: a multi-objective mixed-integer linear case study
2022
·
Lopes, Thiago Cantos
, Michels, Adalberto Sato
, et al.
·
Figshare
Programação cíclica e balanceamento de linhas de montagem
2021
·
Lopes, Thiago Cantos
·
LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas)
An iterative decomposition for asynchronous mixed-model assembly lines: combining balancing, sequencing, and buffer allocation
2019
·
Thiago Cantos Lopes
, Sikora, Celso Gustavo Stall
, et al.
·
Figshare
Show more works
View as search
Works count:
28
Citation count:
726
H-index:
13
I10-index:
14
Year
Topic
Type