Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Shu‐Shun Liu
Observed names:
Liu Shu‐Shun,
Shu-Shun Liu
Institution:
National Yunlin University of Science and Technology
Observed institutions:
National Research Institute for Child Health and Development,
National Yunlin University of Science and Technology
ORCID:
0000-0002-8536-8669
Observed ORCID:
0000-0002-8536-8669
OpenAlex ID:
A5028318616
Resource-constrained construction project scheduling model for profit maximization considering cash flow
2008
·
Shu-Shun Liu
, Chang-Jung Wang
·
Automation in Construction
·
129
Optimizing linear project scheduling with multi-skilled crews
2012
·
Shu-Shun Liu
, Chang-Jung Wang
·
Automation in Construction
·
107
Optimizing project selection and scheduling problems with time-dependent resource constraints
2011
·
Shu-Shun Liu
, Chang-Jung Wang
·
Automation in Construction
·
96
Optimization model for resource assignment problems of linear construction projects
2006
·
Shu-Shun Liu
, Chang-Jung Wang
·
Automation in Construction
·
85
Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
2010
·
Shu-Shun Liu
, Chang-Jung Wang
·
Journal of Construction Engineering and Management
·
59
A Decade of Value Engineering in Construction Projects
2022
·
Wei Tong Chen
, Hew Cameron Merrett
, et al.
·
Advances in Civil Engineering
·
49
PDF
Analyzing Relationships Among Success Variables of Construction Partnering Using Structural Equation Modeling: a Case Study of Taiwan's Construction Industry
2012
·
Wei Tong Chen
, Tung-Tsan Chen
, et al.
·
Journal of Civil Engineering and Management
·
46
PDF
Construction rescheduling based on a manufacturing rescheduling framework
2009
·
Shu-Shun Liu
, Kuo-Chuan Shih
·
Automation in Construction
·
39
Relationships between Social Support, Social Status Perception, Social Identity, Work Stress, and Safety Behavior of Construction Site Management Personnel
2021
·
Ying-Hua Huang
, Chen-Yu Sung
, et al.
·
Sustainability
·
33
PDF
Two‐stage profit optimization model for linear scheduling problems considering cash flow
2009
·
Shu‐Shun Liu
, Chang‐Jung Wang
·
Construction Management and Economics
·
28
Preventive Maintenance Model for National School Buildings in Indonesia Using a Constraint Programming Approach
2021
·
Shu-Shun Liu
, Muhammad Faizal Ardhiansyah Arifin
·
Sustainability
·
19
PDF
Measuring the Perception of Safety Among Taiwan Construction Managers
2013
·
Wei Tong Chen
, Chun Sheng Lu
, et al.
·
Journal of Civil Engineering and Management
·
19
PDF
An Integrated Optimization Model for Life Cycle Pavement Maintenance Budgeting Problems
2022
·
Shu-Shun Liu
, Muhammad Faizal Ardhiansyah Arifin
, et al.
·
IEEE Access
·
17
PDF
A framework of critical resource chain for project schedule analysis
2009
·
Liu Shu‐Shun
, Kuo‐Chuan Shih
·
Construction Management and Economics
·
12
Optimization Model for the Pavement Pothole Repair Problem Considering Consumable Resources
2021
·
Shu-Shun Liu
, Agung Budiwirawan
, et al.
·
Symmetry
·
11
PDF
Two-Stage Optimization Model for Life Cycle Maintenance Scheduling of Bridge Infrastructure
2020
·
Shu-Shun Liu
, Hsin-Yi Huang
, et al.
·
Applied Sciences
·
9
PDF
Study on the Storage and Transportation Optimization of Pre-Fabrication Factory
2005
·
Kuo-Chuan Shih
, Chun-Nen Huang
, et al.
·
International Symposium on Automation and Robotics in Construction (ISARC)
·
9
Emergency Repair Scheduling Model for Road Network Integrating Rescheduling Feature
2021
·
Shu-Shun Liu
, Muhammad Arifin
, et al.
·
Applied Sciences
·
8
PDF
Resource -constrained scheduling of linear projects: A heuristic approach using tabu search heuristics
1999
·
Shu‐Shun Liu
·
Purdue e-Pubs (Purdue University System)
·
7
Optimization Model of Maintenance Scheduling Problem for Heritage Buildings with Constraint Programming
2023
·
Shu-Shun Liu
, Putri Utami
, et al.
·
Buildings
·
6
PDF
Condition-Based Building Maintenance Strategy Selection Using Constraint Programming
2017
·
Shu-Shun Liu
, Gilang Ramadhan
·
International Symposium on Automation and Robotics in Construction (ISARC)
·
4
Precast Storage and Transportation Planning via Component Zoning Optimization
2008
·
Kuo-Chuan Shih
, Shu-Shun Liu
, et al.
·
InTech eBooks
·
4
Non-Sequential Linear Construction Project Scheduling Model for Minimizing Idle Equipment Using Constraint Programming (CP)
2021
·
Shu-Shun Liu
, Agung Budiwirawan
, et al.
·
Mathematics
·
3
PDF
An Optimization Model for Linear Project Scheduling Considering Multi-Skilled Crews
2011
·
Shu-Shun Liu
, Chang-Jung Wang
·
International Symposium on Automation and Robotics in Construction (ISARC)
·
1
Optimization for project selection and scheduling problems considering time-dependent resource constraints
2011
·
Shu-Shun Liu
, Chang-Jung Wang
·
International Conference on Electric Technology and Civil Engineering
·
1
Show more works
View as search
Works count:
29
Citation count:
804
H-index:
13
I10-index:
15
Year
Topic
Type