Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Gwo-Liang Liao
Observed names:
G.-L. Liao,
GWO-LIANG LIAO
Institution:
National Taitung University
Observed institutions:
National Taiwan University of Science and Technology,
National Taitung University,
China University of Science and Technology
ORCID:
0000-0002-1003-4242
Observed ORCID:
0000-0002-1003-4242
OpenAlex ID:
A5029121332
Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance
2008
·
Gwo-Liang Liao
, Yen Hung Chen
, et al.
·
European Journal of Operational Research
·
111
Optimum policies for a system with general imperfect maintenance
2005
·
Shey-Huei Sheu
, Yuh-Bin Lin
, et al.
·
Reliability Engineering & System Safety
·
60
Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance
2010
·
Gwo-Liang Liao
, Shey-Huei Sheu
·
International Journal of Production Economics
·
49
Optimal Policies With Decreasing Probability of Imperfect Maintenance
2005
·
S.-H. Sheu
, Y.-B. Lin
, et al.
·
IEEE Transactions on Reliability
·
38
Optimal production correction and maintenance policy for imperfect process
2006
·
Gwo-Liang Liao
·
European Journal of Operational Research
·
28
Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
2012
·
Gwo-Liang Liao
·
International Journal of Systems Science
·
27
Production and Maintenance Policies for an EPQ Model With Perfect Repair, Rework, Free-Repair Warranty, and Preventive Maintenance
2015
·
Gwo-Liang Liao
·
IEEE Transactions on Systems Man and Cybernetics Systems
·
22
Joint production and maintenance strategy for economic production quantity model with imperfect production processes
2012
·
Gwo-Liang Liao
·
Journal of Intelligent Manufacturing
·
19
Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance
2016
·
Gwo-Liang Liao
·
International Journal of Production Research
·
18
Optimum policy for a production system with major repair and preventive maintenance
2011
·
Gwo-Liang Liao
·
Applied Mathematical Modelling
·
14
PDF
Optimum Maintenance Strategy of a Repairable System Under Long-Term Free Preventive Maintenance Warranty with Predicted Maintenance
2016
·
Gwo-Liang Liao
·
International Journal of Reliability Quality and Safety Engineering
·
9
Production and maintenance strategy for a high-reliability imperfect process with free-repair warranty
2016
·
Gwo-Liang Liao
·
International Journal of Systems Science Operations & Logistics
·
4
Optimal Maintenance Policy to Support the Operation of Manufacturing With Minimal and Delayed Repair
2009
·
GWO-LIANG LIAO
, BOR-LING SHAW
·
International Journal of Reliability Quality and Safety Engineering
·
4
Design and Implementation of a Caterpillar Robot
2018
·
Li-Chun Liao
, Gwo-Liang Liao
, et al.
·
International Conference on Awareness Science and Technology (iCAST)
·
3
Optimal Policy for Scheduled Production Run Time of Economic Production Quantity Model Involving Major Repair and Preventive Maintenance
2025
·
Gwo-Liang Liao
·
International Journal of Reliability Quality and Safety Engineering
·
2
Optimum Policies With Imperfect Maintenance
2004
·
SHEY-HUEI SHEU
, YUH-BIN LIN
, et al.
·
Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM)
·
2
Imperfect Debugging Software Reliability Model with Exponential and Linear Characteristics
2025
·
Gwo-Liang Liao
, Wen-Hsin Chiang
, et al.
·
International Journal of Software Engineering and Knowledge Engineering
·
1
Approximation Algorithms for 2-Source Minimum Routing Cost k-Tree Problems
2007
·
Yen Hung Chen
, Gwo-Liang Liao
, et al.
·
Springer eBooks
·
1
An Imperfect Process Policy With Production Correction and Reorganization
2007
·
GWO-LIANG LIAO
·
International Journal of Reliability Quality and Safety Engineering
·
1
Optimal number of production corrections before maintenance of imperfect production processes
2006
·
Shey-Huei Sheu
, Yuh-Bin Lin
, et al.
·
The International Journal of Advanced Manufacturing Technology
·
1
Optimal Production Policies for Imperfect Processes with Repair, Rework, Outsourcing and Preventive Maintenance
2025
·
Gwo-Liang Liao
, Li-Chun Liao
·
Journal of Advanced Manufacturing Systems
Optimal scheduling problem for Taiwan's post office counters and manpower
2013
·
Gwo-Liang Liao
, Wen-Hsin Chiang
·
IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
An imperfect process strategy for a repairable product with production correction and maintenance
2010
·
Gwo-Liang Liao
, Ya-Ting Chang
, et al.
·
IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
Show more works
View as search
Works count:
23
Citation count:
414
H-index:
10
I10-index:
10
Year
Topic
Type