Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Harun Aydilek
Observed name:
Aydilek, Harun (author)
Observed institutions:
University of Southern California,
Gulf University for Science & Technology,
Kuwait University,
Boğaziçi University,
Kean University
ORCID:
0000-0002-9552-1030
Observed ORCID:
0000-0002-9552-1030
OpenAlex ID:
A5034926284
The two stage assembly flowshop scheduling problem to minimize total tardiness
2013
·
Ali Allahverdi
, Harun Aydilek
·
Journal of Intelligent Manufacturing
·
75
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
2018
·
Ali Allahverdi
, Harun Aydilek
, et al.
·
European Journal of Operational Research
·
50
Total completion time with makespan constraint in no-wait flowshops with setup times
2014
·
Ali Allahverdi
, Harun Aydilek
·
European Journal of Operational Research
·
44
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
2009
·
Ali Allahverdi
, Harun Aydilek
·
International Journal of Production Research
·
38
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan
2015
·
Asiye Aydilek
, Harun Aydilek
, et al.
·
International Journal of Production Research
·
37
Single machine scheduling problem with interval processing times to minimize mean weighted completion time
2014
·
Ali Allahverdi
, Harun Aydilek
, et al.
·
Computers & Operations Research
·
37
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
2019
·
Ali Allahverdi
, Harun Aydilek
, et al.
·
Applied Mathematics and Computation
·
36
Two-stage assembly scheduling problem for minimizing total tardiness with setup times
2016
·
Ali Allahverdi
, Harun Aydilek
, et al.
·
Applied Mathematical Modelling
·
31
PDF
Algorithms for no-wait flowshops with total completion time subject to makespan
2013
·
Ali Allahverdi
, Harun Aydilek
·
The International Journal of Advanced Manufacturing Technology
·
31
Heuristics for no-wait flowshops with makespan subject to mean completion time
2012
·
Harun Aydilek
, Ali Allahverdi
·
Applied Mathematics and Computation
·
31
Increasing the profitability and competitiveness in a production environment with random and bounded setup times
2012
·
Asiye Aydilek
, Harun Aydilek
, et al.
·
International Journal of Production Research
·
28
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
2017
·
Asiye Aydilek
, Harun Aydilek
, et al.
·
Applied Mathematical Modelling
·
23
PDF
A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
2013
·
Harun Aydilek
, Ali Allahverdi
·
Applied Mathematical Modelling
·
23
Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times
2010
·
Ali Allahverdi
, Harun Aydilek
·
Computers & Mathematics with Applications
·
15
PDF
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
2009
·
Harun Aydilek
, Ali Allahverdi
·
Computers & Mathematics with Applications
·
15
PDF
Minimising maximum tardiness in assembly flowshops with setup times
2017
·
Asiye Aydilek
, Harun Aydilek
, et al.
·
International Journal of Production Research
·
14
Minimizing the number of tardy jobs on a two-stage assembly flowshop
2016
·
Ali Allahverdi
, Asiye Aydilek
, et al.
·
Journal of Industrial and Production Engineering
·
13
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
2022
·
Harun Aydilek
, Asiye Aydilek
, et al.
·
International Journal of Industrial Engineering Computations
·
12
PDF
Insider trading with different risk attitudes
2020
·
Wassim Daher
, Harun Aydilek
, et al.
·
Journal of Economics
·
11
An optimization model of retiree decisions under recursive utility with housing
2019
·
Asiye Aydilek
, Harun Aydilek
·
Journal of Economics and Finance
·
11
A better dominance relation and heuristics for Two-Machine No-Wait Flowshops with Maximum Lateness Performance Measure
2020
·
Muberra Allahverdi
, Harun Aydilek
, et al.
·
Journal of Industrial and Management Optimization
·
10
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
2020
·
Harun Aydilek
, Asiye Aydilek
, et al.
·
Engineering Optimization
·
9
Do we really need heterogeneous agent models?
2020
·
Harun Aydilek
, Asiye Aydilek
·
The Quarterly Review of Economics and Finance
·
9
An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time
2021
·
Ali Allahverdi
, Harun Aydilek
, et al.
·
International Journal of Industrial Engineering Computations
·
8
PDF
Insider Trading with Product Differentiation
2012
·
Wassim Daher
, Harun Aydilek
, et al.
·
Journal of Economics
·
5
Show more works
View as search
Works count:
38
Citation count:
627
H-index:
15
I10-index:
21
Year
Topic
Type