Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Chijoo Lee
Institution:
Korea Research Institute for Human Settlements
Observed institutions:
Pohang University of Science and Technology,
Yonsei University,
SUNY Korea,
Gyeonggi Research Institute,
Korea Research Institute for Human Settlements
ORCID:
0000-0003-1376-9380
Observed ORCID:
0000-0003-1376-9380
OpenAlex ID:
A5037144924
Life-Cycle Cost Analysis on Glass Type of High-Rise Buildings for Increasing Energy Efficiency and Reducing CO2 Emissions in Korea
2011
·
Chijoo Lee
, Taehoon Hong
, et al.
·
Journal of Construction Engineering and Management
·
27
Prediction method of real discount rate to improve accuracy of life-cycle cost analysis
2016
·
Chijoo Lee
, Eul-Bum Lee
·
Energy and Buildings
·
24
Analysis of combinations of glazing properties to improve economic efficiency of buildings
2017
·
Chijoo Lee
, Jongsung Won
·
Journal of Cleaner Production
·
20
Automated system for form layout to increase the proportion of standard forms and improve work efficiency
2018
·
Chijoo Lee
, Sungil Ham
·
Automation in Construction
·
18
Analysis of field applicability of the rotation-controllable tower-crane hook block
2011
·
Chijoo Lee
, Ghang Lee
, et al.
·
Automation in Construction
·
18
The Development of Automatic Module for Formwork Layout using the BIM
2009
·
Chijoo Lee
, Sungil Ham
, et al.
·
14
Financing method for real estate and infrastructure development using Markowitz’s portfolio selection model and the Monte Carlo simulation
2019
·
Chijoo Lee
·
Engineering Construction & Architectural Management
·
12
A system to detect potential fires using a thermographic camera
2018
·
Chijoo Lee
, Hyungjun Yang
·
Natural Hazards
·
9
Feasibility of beam erection with a motorized hook-block
2014
·
Chijoo Lee
, Ghang Lee
·
Automation in Construction
·
9
Method to reduce the gap between construction and IT companies to improve suitability before selecting an enterprise system
2016
·
Chijoo Lee
, Chiheon Lee
·
Computers in Industry
·
8
Analysis of Construction Productivity Based on Construction Duration Per Floor and Per Gross Area, With Identification of Influential Factors
2021
·
Chijoo Lee
, Jongsung Won
·
Journal of Civil Engineering and Management
·
7
PDF
Evaluating construction delays using productivity-based resource reallocation for economic feasibility
2022
·
Chijoo Lee
·
Engineering Construction & Architectural Management
·
6
A context-awareness system that uses a thermographic camera to monitor energy waste in buildings
2016
·
Chijoo Lee
, Hyungjun Yang
·
Energy and Buildings
·
6
Analysis of the Causes and Level of Maintenance for Enterprise Systems in Construction Companies
2018
·
Chijoo Lee
, Chiheyon Lee
, et al.
·
Journal of Civil Engineering and Management
·
3
PDF
Analysis of the Technology Adoption Impact Factors for Automated Construction Equipment
2013
·
Chijoo Lee
, Ghang Lee
, et al.
·
Korean Journal of Construction Engineering and Management
·
3
PDF
Selecting High Priority Activities for the Reallocation of Resources to Reduce Construction Duration
2022
·
Chijoo Lee
·
Journal of Civil Engineering and Management
·
2
PDF
Construction Industry Progress of South Korea: 1995–2019
2021
·
Chijoo Lee
·
Emerald Group Publishing Limited eBooks
·
2
Analysis on Real Discount Rate for Prediction Accuracy Improvement of Economic Investment Effect
2015
·
Chijoo Lee
, Eul-Bum Lee
·
Korean Journal of Construction Engineering and Management
·
2
PDF
Analyzing Risk Factors of the Real Estate Project Financial
2009
·
Chijoo Lee
, 김상기
·
대한건축학회 논문집 - 구조계
·
2
BIM-Based Safety Design Guide Systems Using Rule Checking and LLM Approaches for Preventing Construction Accidents
2026
·
Chijoo Lee
, Sungil Ham
·
Buildings
·
1
Design Guide Systems of Safety Handrail based on DfS and BIM for Preventing of Fall Accidents
2020
·
Chijoo Lee
, Sungil Ham
·
대한건축학회 논문집
·
1
The impact of building information modeling on reducing greenhouse gases through design validation
2025
·
Chijoo Lee
·
Journal of Civil Engineering and Management
PDF
떨어짐 사고 예방을 위한 DfS와 BIM 기반의 안전난간 설계가이드 시스템
2020
·
Chijoo Lee
, Sungil Ham
The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract
2020
·
Chijoo Lee
, Taewook Kwan
, et al.
·
Journal of the Korea Institute of Building Construction
Economic impact of safety improvement by a rotation-controllable tower-crane hook block
2019
·
Chijoo Lee
, Ghang Lee
Show more works
View as search
Works count:
28
Citation count:
194
H-index:
9
I10-index:
7
Year
Topic
Type