Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Ray Bratton
Observed names:
Bratton, Ray,
Bratton,Ray
Institution:
Los Alamos National Laboratory
Observed institution:
Los Alamos National Laboratory
OpenAlex ID:
A5044487635
Results from the Installation of a New 201 MHz RF System at LANSCE
2014
·
J. Lyles
, Walter Barkley
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
·
5
PDF
Design of a New VHF RF Power Amplifier System for LANSCE
2010
·
Lyles, John
, Archuletta, Steven
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
·
4
PDF
Installation and Operation of Replacement 201 MHz High Power RF System at LANSCE
2015
·
Lyles, John
, Barkley, Walter
, et al.
·
JACOW
·
3
RF Design and Operating Results for a New 201.25 MHz RF Power Amplifier for LANSCE
2011
·
J. Lyles
, D. Bača
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
·
3
New Drift-Tube Linac RF Systems at LANSCE
2018
·
Lyles, John
, Bratton, Ray
, et al.
·
JACOW
·
2
Design, Fabrication, Installation and Operation of New 201 MHz RF Systems at LANSCE
2017
·
Lyles, John
, Barkley, Walter
, et al.
·
JACOW
·
2
PDF
New High Power Test Facility for VHF Power Amplifiers at LANSCE
2011
·
J. Lyles
, S.F. Archuletta
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
·
2
PDF
High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity
2026
·
USDOE National Nuclear Security Administration (NNSA), Office of Defense Programs (DP)
, Maria Barrueta
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
PDF
RF amplifier system reconfiguration plans for new DTL and RFQ
2026
·
Sanchez Barrueta,Maria
, Bratton,Ray
, et al.
·
JACOW
Ten Years of RF Operation with the TH628L Diacrode at LANSCE
2024
·
John Lyles
, Maria Sanchez Barrueta
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Cooling Systems for the New 201.25 MHz Final Power Amplifiers at Los Alamos Neutron Science Center (LANSCE)
2015
·
Barkley, Walter
, Baca, David
, et al.
·
JACOW
SYSTEM CONSIDERATIONS FOR 201.25 MHz RF SYSTEM FOR LANSCE
2013
·
J. Lyles
, Walter Barkley
, et al.
A High Power Test Facility for New 201.25 Mhz Power Amplifiers and Components
2012
·
J. Lyles
, John Davis
, et al.
Show more works
View as search
Works count:
15
Citation count:
24
H-index:
3
I10-index:
Year
Topic
Type