Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Önder Ökmen
Observed names:
Onder Okmen,
Ö Ökmen,
Ökmen, Ö. (author)
Institutions:
Ministry of Transport, Maritime Affairs and Communications,
Delft University of Technology
Observed institutions:
Ministry of Transport, Maritime Affairs and Communications,
DSI Genel Mudurlugu,
Gaziantep University,
Epoka University,
Delft University of Technology
ORCID:
0000-0003-3102-0277
Observed ORCID:
0000-0003-3102-0277
OpenAlex ID:
A5053447939
Risk analysis in fixed-price design–build construction projects
2003
·
Ahmet Öztaş
, Önder Ökmen
·
Building and Environment
·
108
Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model
2007
·
Önder Ökmen
, Ahmet Öztaş
·
Journal of Construction Engineering and Management
·
100
Judgmental risk analysis process development in construction projects
2004
·
Ahmet Öztaş
, Önder Ökmen
·
Building and Environment
·
72
Construction cost analysis under uncertainty with correlated cost risk analysis model
2010
·
Önder Ökmen
, Ahmet Öztaş
·
Construction Management and Economics
·
58
Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project
2022
·
Lise Andringa
, Önder Ökmen
, et al.
·
Journal of Management in Engineering
·
19
Scenario based evaluation of a cost risk model through sensitivity analysis
2015
·
Önder Ökmen
, Ahmet Öztaş
·
Engineering Construction & Architectural Management
·
14
Risk assessment for determining best design alternative in a state-owned irrigation project in Turkey
2015
·
Önder Ökmen
·
KSCE Journal of Civil Engineering
·
10
Employee perspectives on risk management in a construction company
2024
·
Önder Ökmen
, Martijn Leijten
, et al.
·
Journal of Risk Research
·
6
PDF
A cPM-based scheduling method for construction projects with fuzzy sets and fuzzy operations
2014
·
Önder Ökmen
, Ahmet Öztaş
·
Journal of the South African Institution of Civil Engineering
·
6
Comparison of Design Alternatives Based on Lifecycle Costing: Case of an Irrigation Project in Turkey
2014
·
Önder Ökmen
·
Journal of Management in Engineering
·
3
Discussion of “Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project”
2023
·
Önder Ökmen
·
Journal of Management in Engineering
·
2
PDF
Uncertainty evaluation with fuzzy schedule risk analysis model in activity networks of construction projects : technical paper
2014
·
Önder Ökmen
, Ahmet Öztaş
·
Joernaal van die Suid-Afrikaanse Instituut van Siviele Ingenieurswese
·
1
A CPM-based scheduling method for construction projects with fuzzy sets and fuzzy operations : technical paper
2014
·
Önder Ökmen
, Ahmet Öztaş
·
1
A procedure for critical path method-based scheduling in linear construction projects
2013
·
Önder Ökmen
·
Joernaal van die Suid-Afrikaanse Instituut van Siviele Ingenieurswese
·
1
Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects
2013
·
Onder Okmen
·
Journal of Construction Engineering and Project Management
·
1
PDF
Co-management of risks and complexities to improve schedule management in engineering projects
2025
·
Ministry of Transport and Infrastructure, Türkiye
, Önder Ökmen
, et al.
·
Journal of Construction Engineering Management & Innovation
PDF
Flexible management of critical path method schedules in complex construction projects
2025
·
Ö Ökmen
·
Journal of the South African Institution of Civil Engineering
Evaluation of Managerial Flexibilities in Critical Path Method-Based Construction Schedules
2022
·
Önder Ökmen
, Marian Bosch-Rekveldt
, et al.
·
Lecture notes in management and industrial engineering
PDF
Evaluation of Expansion of Managerial Flexibilities of Critical Path Method Scheduling Under Uncertainty Through A Risk Simulation Model
2021
·
Ökmen, Ö. (author)
, Bosch-Rekveldt, M.G.C. (author)
, et al.
·
Research Repository (Delft University of Technology)
PDF
Evaluation and Comparison of the Public Construction Legislations of Turkey and the Netherlands in the Context of Project Planning and Control
2020
·
Ökmen, Ö. (author)
, Bosch-Rekveldt, M.G.C. (author)
, et al.
·
Research Repository (Delft University of Technology)
PDF
A Procedure for Application of Critical Path Method with Fuzzy Sets and Fuzzy Operations
2013
·
Önder Ökmen
, Ahmet Öztaş
·
Health and safety at work (Epoka University)
Hybrid analytic/rule‐based expert system for channel covering decision support
2010
·
Aytac Guven
, Önder Ökmen
·
Irrigation and Drainage
Show more works
View as search
Works count:
22
Citation count:
402
H-index:
7
I10-index:
7
Year
Topic
Type