Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Chérif Sadfi
Observed names:
C. Sadfi,
Cherif Sadfi,
SADFI, Chérif,
Sadfi, Chérif
Institutions:
Tunis University,
National Engineering School of Tunis,
Tunis El Manar University
Observed institutions:
Institut polytechnique de Grenoble,
Tunis University,
Centre National de la Recherche Scientifique,
Université de Technologie de Troyes,
National Engineering School of Tunis,
Tunis El Manar University
show all 6
OpenAlex ID:
A5055383149
An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints
2003
·
Cherif Sadfi
, Bernard Penz
, et al.
·
European Journal of Operational Research
·
123
Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
2008
·
Racem Mellouli
, Chérif Sadfi
, et al.
·
European Journal of Operational Research
·
79
Optimization of the integrated problem of employee timetabling and job shop scheduling
2021
·
Mohamed Frihat
, Atidel B.Hadj-Alouane
, et al.
·
Computers & Operations Research
·
22
An improved heuristic and an exact algorithm for the 2D strip and bin packing problem
2009
·
Abdelghani Bekrar
, Imed Kacem
, et al.
·
International Journal of Product Development
·
15
A branch-and-bound method for the single-machine scheduling problem under a non-availability constraint for maximum delivery time minimization
2015
·
Walid Hfaiedh
, Chérif Sadfi
, et al.
·
Applied Mathematics and Computation
·
13
A dynamic programming algorithm for the single machine total completion time scheduling problem with availability constraints
2001
·
Chérif Sadfi
·
8
A Branch and Bound Algorithm for solving the 2D Strip Packing Problem
2006
·
Abdelghani Bekrar
, Imed Kacem
, et al.
·
International Conference on Service Systems and Service Management
·
7
Branch and Bound and Dynamic Programming to Minimize the Total Completion Times on a Single Machine with Availability Constraints
2006
·
I. Kacem
, C. Sadfi
, et al.
·
Conference proceedings/Conference proceedings - IEEE International Conference on Systems, Man, and Cybernetics
·
7
Optimization of integrated employee timetabling and Hybrid Job Shop Scheduling under time lag constraints
2014
·
Mohamed Frihat
, Cherif Sadfi
, et al.
·
International Conference on Control, Decision and Information Technologies (CoDIT)
·
6
Lagrangian relaxation and column generation-based lower bounds for the Pm,hj1‖∑wiCi scheduling problem
2013
·
Racem Mellouli
, Imed Kacem
, et al.
·
Applied Mathematics and Computation
·
5
Problèmes d'ordonnancement avec minimisation des encours
2002
·
Chérif Sadfi
·
OpenGrey (Institut de l'Information Scientifique et Technique)
·
4
Lower bounds for total weighted completion scheduling problem with availability constraints
2009
·
Cherif Sadfi
, Imed Kacem
, et al.
·
International Conference on Computers and Industrial Engineering
·
2
MSPT2 Heuristic and Dynamic Programming Method for the Parallel Machine Scheduling Problem with scheduled Preventive Maintenance
2006
·
Racem Mellouli
, Cherif Sadfi
, et al.
·
International Conference on Service Systems and Service Management
·
1
A Column Generation Method for the Parallel-Machine Scheduling Problem with availability constraint
2006
·
Racem Mellouli
, Cherif Sadfi
, et al.
·
The Multiconference on Computational Engineering in Systems Applications
·
1
An iterative lower bound algorithm for the single-machine scheduling problem under a non-availability constraint for maximum delivery time minimization
2014
·
Walid Hfaiedh
, Cherif Sadfi
, et al.
·
International Conference on Control, Decision and Information Technologies (CoDIT)
Total weighted completion scheduling problem with availability constraints
2009
·
Cherif Sadfi
, Imed Kacem
, et al.
·
International Conference on Computers and Industrial Engineering
Branch-and-Bound Method to solve the P/sub m/, h/sub j1/||/spl Sigma/C/sub i/ problem
2006
·
Racem Mellouli
, Cherif Sadfi
, et al.
·
International Conference on Service Systems and Service Management
Branch-and-Bound Method tosolve thePm,h ECi problem
2006
·
Chérif Sadfi
, Chengbin Chu
MSPT2Heuristic andDynamic Programming Methodfor theParallel Machine Scheduling Problem withscheduled Preventive Maintenance
2006
·
Chérif Sadfi
, Chengbin Chu
A Column Generatlon Mlethod fortheParallel- Machine Schedullng Problem wlth availability constralnt
2006
·
Chérif Sadfi
, Chengbin Chu
Comparison of Heuristics for Solving a Flowshop Problem
2000
·
Chérif Sadfi
, Azita Karamipour
, et al.
·
IFAC Proceedings Volumes
Show more works
View as search
Works count:
23
Citation count:
293
H-index:
7
I10-index:
5
Year
Topic
Type