Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Viswanath Kumar Ganesan
Observed names:
V. K. Ganesan,
V.K. Ganesan
Institutions:
Indian Institute of Technology Madras,
Tata Consultancy Services (India)
Observed institutions:
Nanyang Technological University,
Indian Institute of Technology Madras,
Singapore-MIT Alliance for Research and Technology,
Tata Consultancy Services (India),
Massachusetts Institute of Technology
ORCID:
0000-0001-7250-7378
Observed ORCID:
0000-0001-7250-7378
OpenAlex ID:
A5062810592
Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
2005
·
K. P. Li
, V. K. Ganesan
, et al.
·
International Journal of Production Research
·
74
Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
2006
·
Kunpeng Li
, Viswanath Kumar Ganesan
, et al.
·
Computers & Industrial Engineering
·
54
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
2007
·
Kunpeng Li
, Appa Iyer Sivakumar
, et al.
·
European Journal of Operational Research
·
47
Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
2008
·
Kunpeng Li
, Appa Iyer Sivakumar
, et al.
·
International Journal of Production Economics
·
30
Solution Methodology for Synchronizing Assembly Manufacturing and Air Transportation of Consumer Electronics Supply Chain
2004
·
Kunpeng Li
, Appa Iyer Sivakumar
, et al.
·
SSRN Electronic Journal
·
20
Hierarchical minimization of completion time variance and makespan in jobshops
2004
·
Viswanath Kumar Ganesan
, Appa Iyer Sivakumar
, et al.
·
Computers & Operations Research
·
18
Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain
2005
·
Kunpeng Li
, Viswanath Kumar Ganesan
, et al.
·
International Journal of Logistics Systems and Management
·
16
Order acceptance and scheduling: overview and complexity results
2019
·
Venkata Prasad Palakiti
, Usha Mohan
, et al.
·
International Journal of Operational Research
·
15
Adaptive Inventory Replenishment for Dynamic Supply Chains with Uncertain Market Demand
2020
·
Viswanath Kumar Ganesan
, David Sundararaj
, et al.
·
Lecture notes in mechanical engineering
·
11
Solving Large Scale Vehicle Routing Problems with Hard Time Windows under Travel Time Uncertainty
2022
·
K Haripriya
, Viswanath Kumar Ganesan
·
IFAC-PapersOnLine
·
9
Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times
2006
·
Viswanath Kumar Ganesan
, Appa Iyer Sivakumar
·
International Journal of Production Economics
·
9
Hot lot management: minimizing cycle time in batch processes
2005
·
A.K. Gupta
, V.K. Ganesan
, et al.
·
IEEE International Engineering Management Conference (IEMC)
·
8
Scenario-based stochastic shelter location-allocation problem with vulnerabilities for disaster relief network design
2021
·
Viswanath Kumar Ganesan
, Usha Mohan
, et al.
·
European J of Industrial Engineering
·
7
Order acceptance and scheduling in a parallel machine environment with weighted completion time
2018
·
Venkata Prasad Palakiti
, Usha Mohan
, et al.
·
European J of Industrial Engineering
·
7
Forecasting: Bayesian Inference Using Markov Chain Monte Carlo Simulation
2019
·
Swaminathan Meenakshisundaram
, Anirudh Srikanth
, et al.
·
Smart innovation, systems and technologies
·
5
Enhancing operational efficiency of a container operator: a simulation optimization approach
2011
·
Santanu Sinha
, Viswanath Kumar Ganesan
·
Winter Simulation Conference
·
5
Look ahead batching to minimize earliness/tardiness measures in batch processes
2005
·
A.K. Gupta
, S.A. Iyer
, et al.
·
IEEE Conference on Robotics, Automation and Mechatronics (RAM)
·
5
Enhancing operational efficiency of a container operator: A simulation optimization approach
2011
·
Santanu Sinha
, Viswanath Kumar Ganesan
·
Winter Simulation Conference
·
4
Markov Process Modeling of A System Under WIPLOAD Control
2005
·
Chao Qi
, Sivakumar Appa Iyer
, et al.
·
DSpace@MIT (Massachusetts Institute of Technology)
·
4
Special Issue on Contemporary Research Studies in Operations Research, Business Analytics, and Business Intelligence
2025
·
Viswanath Kumar Ganesan
, S. Vinodh
, et al.
·
International Journal of Mathematical Engineering and Management Sciences
·
3
PDF
Multi-period Shelter Location-Allocation Problem with Network and Location Vulnerabilities for the Response Phase of Disaster Management
2022
·
Sweety Hansuwa
, Usha Mohan
, et al.
·
IFIP advances in information and communication technology
·
3
Cycle time variance minimization in dynamic scheduling of single machine systems
2008
·
Amit Kumar Gupta
, Viswanath Kumar Ganesan
, et al.
·
The International Journal of Advanced Manufacturing Technology
·
3
Bi-objective schedule control of batch processes in semiconductor manufacturing
2005
·
V.K. Ganesan
, A.K. Gupta
, et al.
·
IEEE Conference on Robotics, Automation and Mechatronics (RAM)
·
3
A novel constraint propagation approach for airline schedule design problem
2017
·
Sumit Raut
, Viswanath Kumar Ganesan
, et al.
·
International Journal of Mathematics in Operational Research
·
2
Dynamic bi-objective Pareto-schedule generation and control in semiconductor supply chain
2005
·
V.K. Ganesan
, A.K. Gupta
, et al.
·
IEEE International Engineering Management Conference (IEMC)
·
2
Show more works
View as search
Works count:
32
Citation count:
365
H-index:
9
I10-index:
9
Year
Topic
Type