Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Avraham Shtub
Observed names:
A Shtub,
A. SHTUB,
A. Shtub,
AVRAHAM SHTUB,
Shtub, Avraham,
Shtub, Avraham.
show all 6
Institution:
Technion – Israel Institute of Technology
Observed institutions:
Tulane University,
Project Management Institute,
Tel Aviv University,
Technion – Israel Institute of Technology,
Vanderbilt University,
University of Washington,
Ruppin Academic Center,
Washington State University
show all 8
ORCID:
0000-0002-3140-8151
Observed ORCID:
0000-0002-3140-8151
OpenAlex ID:
A5065394068
R&D project evaluation: An integrated DEA and balanced scorecard approach
2007
·
Harel Eilat
, Boaz Golany
, et al.
·
Omega
·
264
Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology
2005
·
Harel Eilat
, Boaz Golany
, et al.
·
European Journal of Operational Research
·
263
Project management: engineering, technology, and implementation
1994
·
Avraham Shtub
, Jonathan F. Bard
, et al.
·
Prentice-Hall, Inc eBooks
·
178
The Impact of Breaks on Forgetting When Performing A Repetitive Task
1989
·
SHLOMO GLOBERSON
, NISSAN LEVIN
, et al.
·
IIE Transactions
·
171
An analytic framework for sequencing mixed model assembly lines
1992
·
JONATHAN F. BARD
, EZEY DAR-ELJ
, et al.
·
International Journal of Production Research
·
158
Sequencing mixed-model assembly lines to level parts usage and minimize line length
1994
·
J. F. BARD
, A. SHTUB
, et al.
·
International Journal of Production Research
·
120
Design of Sustainable Product Life Cycles
2008
·
Niemann, Jörg
, Tichkiewitch, Serge
, et al.
·
Springer eBooks
·
114
Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives
2004
·
Izack Cohen
, Avishai Mandelbaum
, et al.
·
Project Management Journal
·
114
Project Management: Processes, Methodologies, and Economics
1994
·
Avraham Shtub
, Jonathan F. Bard
, et al.
·
114
Simulation‐based Learning in Engineering Education: Performance and Transfer in Learning Project Management
2006
·
L. Davidovitch
, A. Parush
, et al.
·
Journal of Engineering Education
·
110
Simulation-based models of emergency departments:
2011
·
Sergey Zeltyn
, Yariv N. Marmor
, et al.
·
ACM Transactions on Modeling and Computer Simulation
·
102
Evaluating the Layout of Graphical User Interface Screens: Validation of a Numerical Computerized Model
1998
·
Avraham Parush
, Ronen Nadir
, et al.
·
International Journal of Human-Computer Interaction
·
95
Learning histories in simulation-based teaching: the effects on self-learning and transfer
2002
·
A Parush
, H Hamm
, et al.
·
Computers & Education
·
92
Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis
1999
·
Avraham Shtub
, Ronen Versano
·
International Journal of Production Economics
·
77
Scheduling projects to maximize net present value — the case of time-dependent, contingent cash flows
1997
·
Ran Etgar
, Avraham Shtub
, et al.
·
European Journal of Operational Research
·
66
Balancing Mixed Model Lines with In-Process Inventories
1985
·
Amiya K. Chakravarty
, Avraham Shtub
·
Management Science
·
64
Learning and forgetting industrial skills: An experimental model
1993
·
Avraham Shtub
, Nissan Levin
, et al.
·
International Journal of Human Factors in Manufacturing
·
63
A methodology for the selection of assembly systems
1989
·
A. SHTUB
, E. M. DAR-EL
·
International Journal of Production Research
·
60
Enterprise Resource Planning (ERP): The Dynamics of Operations Management
2002
·
Shtub, Avraham
·
Kluwer Academic Publishers eBooks
·
59
Grouping methods for printed circuit board assembly
1991
·
ODED MAIMON
, AVRAHAM SHTUB
·
International Journal of Production Research
·
58
The stochastic time–cost tradeoff problem: A robust optimization approach
2006
·
Izack Cohen
, Boaz Golany
, et al.
·
Networks
·
56
A framework for teaching and training in the Enterprise Resource Planning (ERP) era
2001
·
Avraham Shtub
·
International Journal of Production Research
·
54
Using an Artificial Neural Network for Improving the Prediction of Project Duration
2022
·
Itai Lishner
, Avraham Shtub
·
Mathematics
·
53
PDF
Role of similarity measures in PCB grouping procedures
1992
·
AVRAHAM SHTUB
, ODED MAIMON1
·
International Journal of Production Research
·
48
Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology
2005
·
Izack Cohen
, Boaz Golany
, et al.
·
Annals of Operations Research
·
45
Show more works
View as search
Works count:
158
Citation count:
4,063
H-index:
34
I10-index:
81
Year
Topic
Type