Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Yije Kim
Institution:
Honam University
Observed institutions:
Honam University,
Sungkyunkwan University
ORCID:
0000-0003-4024-1637
Observed ORCID:
0000-0003-4024-1637
OpenAlex ID:
A5073272513
BIM data requirements for 2D deliverables in construction documentation
2022
·
Yije Kim
, Sangyoon Chin
, et al.
·
Automation in Construction
·
28
PDF
Automatic Stereo Vision-Based Inspection System for Particle Shape Analysis of Coarse Aggregates
2021
·
Nguyen Manh Tuan
, Yije Kim
, et al.
·
Journal of Computing in Civil Engineering
·
16
Rule-based automation algorithm for generating 2D deliverables from BIM
2024
·
Yije Kim
, Sangyoon Chin
, et al.
·
Journal of Building Engineering
·
12
Deep-Learning-Based Sound Classification Model for Concrete Pouring Work Monitoring at a Construction Site
2023
·
Inchie Kim
, Yije Kim
, et al.
·
Applied Sciences
·
10
PDF
BIM–LLM integration in AECO workflows: Applications, validation, and future directions
2026
·
Ingeon Park
, Yije Kim
, et al.
·
Automation in Construction
·
8
Quantitative Evaluation Method and Process of BIM Data for Generating BIM-Based 2D Deliverables
2023
·
Yije Kim
, Sangyoon Chin
, et al.
·
Buildings
·
8
PDF
A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase
2018
·
Byeoung-Ju Kim
, Yije Kim
, et al.
·
KIBIM Magazine
·
6
An Analysis of the Problems of BIM-Based Drawings and Implementation During the Construction Document Phase
2019
·
Yije Kim
, Sangyoon Chin
·
International Symposium on Automation and Robotics in Construction (ISARC)
·
5
Optimizing BIM drawing element placement through reinforcement learning
2025
·
Yije Kim
, Jeongjun Park
, et al.
·
Automation in Construction
·
4
BIM-LogNet clustering for automated design and drawing productivity measurement
2025
·
Yije Kim
, Ghang Lee
, et al.
·
Advanced Engineering Informatics
·
1
Developing a Drawing Template for BIM software to Improve BIMbased Drawing Work Efficiency in the Construction Document Phase
2020
·
Yije Kim
, Inchie Kim
, et al.
·
KIBIM Magazine
A Study on Strategy and Utilization for Practical Application of BIM in MEP Area
2020
·
Yije Kim
, Kim Yong-In
, et al.
·
KIBIM Magazine
Analyzing the Necessity and Application of Early Involvement of Specialty Contractors for Efficient Utilization of BIM
2019
·
Yije Kim
, Sangyoon Chin
·
Korean Journal of Computational Design and Engineering
실시설계단계 Bim과 도면의 정합성 검토를 위한체크리스트 개발
2018
·
Byeoung-Ju Kim
, Yije Kim
, et al.
Show more works
View as search
Works count:
14
Citation count:
98
H-index:
6
I10-index:
4
Year
Topic
Type