Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Rasaratnam Logendran
Observed names:
Logendran Rasaratnam,
Logendran, Rasaratnam,
R Logendran,
R. LOGENDRAN,
R. Logendran,
RASARATNAM LOGENDRAN
show all 6
Institution:
Oregon State University
Observed institutions:
Oklahoma State University,
Oregon State University,
Sharif University of Technology,
Asian Institute of Technology,
Southern Illinois University Edwardsville
OpenAlex ID:
A5083819536
Works
95
Awards
4
Aggregate production planning — A survey of models and methodologies
1992
·
Sang-jin Nam
, Rasaratnam Logendran
·
European Journal of Operational Research
·
237
Scheduling unrelated parallel machines with sequence-dependent setups
2006
·
Rasaratnam Logendran
, Brent McDonell
, et al.
·
Computers & Operations Research
·
142
An Enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes
2016
·
Omid Shahvari
, Rasaratnam Logendran
·
Computers & Operations Research
·
117
Total flow time minimization in a flowshop sequence-dependent group scheduling problem
2009
·
Nasser Salmasi
, Rasaratnam Logendran
, et al.
·
Computers & Operations Research
·
105
Tabu search-based heuristics for cellular manufacturing systems in the presence of alternative process plans
1994
·
R. LOGENDRAN
, P. RAMAKRJSHNA
, et al.
·
International Journal of Production Research
·
104
Sequence-dependent group scheduling problems in flexible flow shops
2005
·
Rasaratnam Logendran
, Paula deSzoeke
, et al.
·
International Journal of Production Economics
·
101
Impact of sequence of operations and layout of cells in cellular manufacturing
1991
·
RASARATNAM LOGENDRAN
·
International Journal of Production Research
·
94
Group scheduling in flexible flow shops
2004
·
Rasaratnam Logendran
, Sara Carson
, et al.
·
International Journal of Production Economics
·
93
A workload based model for minimizing total intercell and intracell moves in cellular manufacturing
1990
·
RASARATNAM LOGENDRAN
·
International Journal of Production Research
·
85
Hybrid flow shop batching and scheduling with a bi-criteria objective
2016
·
Omid Shahvari
, Rasaratnam Logendran
·
International Journal of Production Economics
·
77
Unrelated parallel machine scheduling with job splitting
2004
·
RASARATNAM LOGENDRAN
, FENNY SUBUR
·
IIE Transactions
·
75
A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect
2017
·
Omid Shahvari
, Rasaratnam Logendran
·
International Journal of Production Economics
·
68
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
2004
·
Rasaratnam Logendran
, Nasser Salmasi
, et al.
·
Computers & Operations Research
·
68
An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems
2011
·
Omid Shahvari
, Nasser Salmasi
, et al.
·
International Journal of Production Research
·
67
Minimizing the makespan of a group scheduling problem: a new heuristic
1991
·
Rasaratnam Logendran
, Nudtapon Nudtasomboon
·
International Journal of Production Economics
·
64
Uncapacitated plant location-allocation problems with price sensitive stochastic demands
1988
·
Rasaratnam Logendran
, M.Palmer Terrell
·
Computers & Operations Research
·
62
Periodic product distribution from multi-depots under limited supplies
2006
·
Parthana Parthanadee
, Rasaratnam Logendran
·
IIE Transactions
·
61
Sequencing of robot activities and parts in two-machine robotic cells
1996
·
R. LOGENDRAN
, C. SRISKANDARAJAH
·
International Journal of Production Research
·
61
Carryover sequence-dependent group scheduling with the integration of internal and external setup times
2012
·
M.T. Yazdani Sabouni
, Rasaratnam Logendran
·
European Journal of Operational Research
·
58
Group-scheduling problems in electronics manufacturing
2009
·
Cumhur A. Gelogullari
, Rasaratnam Logendran
·
Journal of Scheduling
·
51
Integrated assembly line balancing with resource restrictions
2009
·
Ilkyeong Moon
, Rasaratnam Logendran
, et al.
·
International Journal of Production Research
·
51
Two-machine group scheduling problem with blocking and anticipatory setups
1993
·
Rasaratnam Logendran
, Chelliah Sriskandarajah
·
European Journal of Operational Research
·
51
A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics
2015
·
Mir Abbas Bozorgirad
, Rasaratnam Logendran
·
The International Journal of Advanced Manufacturing Technology
·
48
Combined heuristics for bi-level group scheduling problems
1995
·
Rasaratnam Logendran
, Luen Mai
, et al.
·
International Journal of Production Economics
·
45
Sequence-dependent group scheduling problem on unrelated-parallel machines
2012
·
Mir Abbas Bozorgirad
, Rasaratnam Logendran
·
Expert Systems with Applications
·
43
Show more works
View as search
Works count:
95
Citation count:
2,804
H-index:
32
I10-index:
55
Year
Topic
Type