Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Paul Tedd
Observed names:
P TEDD,
P Tedd,
P. Tedd
Observed institutions:
University of Cambridge,
Building Research Establishment,
MWH (United Kingdom),
Department of the Environment,
Cranfield University
OpenAlex ID:
A5083830602
Laboratory and In Situ Tests for Long-Term Hydraulic Conductivity of a Cement-Bentonite Cutoff Wall
2009
·
Kaushal Joshi
, Cedric Kechavarzi
, et al.
·
Journal of Geotechnical and Geoenvironmental Engineering
·
75
Behaviour of a propped embedded retaining wall in stiff clay at Bell Common Tunnel
1984
·
P. Tedd
, B. M. Chard
, et al.
·
Géotechnique
·
49
Sustainable brownfield re-development — risk management
2001
·
P Tedd
, J.A Charles
, et al.
·
Engineering Geology
·
34
The effect of reservoir drawdown and long-term consolidation on the deformation of old embankment dams
1997
·
P. Tedd
, C. J. A. Charles
, et al.
·
Géotechnique
·
28
The Kielder experimental tunnel: final results
1983
·
W. H. Ward
, P. Tedd
, et al.
·
Géotechnique
·
23
In situ measurement of horizontal stress in overconsolidated clay using push-in spade-shaped pressure cells
1981
·
P. Tedd
, J. A. Charles
·
Géotechnique
·
17
Origins of British reservoir safety legislation 1850–1930
2024
·
J. Andrew Charles
, Paul Tedd
·
Dams and Reservoirs
·
7
An in situ permeability measurement technique for cut-off walls using the Cambridge self boring pressuremeter
2001
·
S Ratnam
, K Soga
, et al.
·
Cambridge University Engineering Department Publications Database
·
6
Discussion: In situ measurement of horizontal stress in overconsolidated clay using push-in spade-shaped pressure cells
1982
·
P. Tedd
, J. A Charles
·
Géotechnique
·
6
PDF
Investigating hydraulic fracture at a puddle clay core dam
2011
·
Paul Tedd
, Ian C. Carter
, et al.
·
Dams and Reservoirs
·
5
Settlement of old embankment dams and reservoir drawdown
2002
·
P Tedd
, J A Charles
, et al.
·
5
Investigation of the performance of cement-bentonite cut-off walls in aggressive ground at a disused gasworks site
1997
·
P. Tedd
, I. R. Holton
, et al.
·
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
·
5
Assessment of the Piezocone to Measure the In-situ Properties of Cement-bentonite Slurry Trench Cut-off Walls
1997
·
P. Tedd
, Anthony Butcher
, et al.
·
5
Research into the Performance of Bentonite-Cement Slurry Trench Cut-Off Walls in the U.K.
1995
·
P. Tedd
, I. R. Holton
, et al.
·
Springer eBooks
·
5
Behaviour of a propped embedded retaining wall at Bell Common Tunnel in the longer term
1989
·
I. F. Symons
, P Tedd
·
Géotechnique
·
4
The strength of London Clay in relation to the design of embedded retaining walls
1985
·
P. Tedd
, J. A. Charles
·
Géotechnique
·
3
Publications and bibliographies of the British Dam Society
2010
·
Paul Tedd
, J. Andrew Charles
·
Dams and Reservoirs
·
2
Colliford and Roadford dams: performance of the asphaltic concrete membranes and the embankments
2002
·
J K Hopkins
, P Tedd
, et al.
·
2
The role of risk analysis in the safety management of embankment dams
1998
·
J. A. Charles
, P. Tedd
, et al.
·
2
SEVENTY-FIVE YEARS OF BUILDING RESEArCH: GEOTECHNICAL ASPECTS.,
1996
·
J A CHARLES
, R M C DRISCOLL
, et al.
·
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
·
2
Response to discussion: Origins of British reservoir safety legislation 1850–1930
2025
·
J Andrew Charles
, Paul Tedd
·
Dams and Reservoirs
·
1
Insitu Assessment of a Cement-bentonite Containment System
2004
·
Kenneth J. Sutherland
, Cedric Kechavarzi
, et al.
·
Emerald Group Publishing Limited eBooks
·
1
Permeability measurement using the self boring pressuremeter
2001
·
S Ratnam
, K Soga
, et al.
·
Cambridge University Engineering Department Publications Database
·
1
The ICOLD Committee on Rehabilitation of Dams
1998
·
G. P. Sims
, P. Tedd
·
1
Investigating internal erosion at Brent Da m
1998
·
P. Tedd
, D. P. M. Dutton
, et al.
·
1
Show more works
View as search
Works count:
45
Citation count:
294
H-index:
7
I10-index:
6
Year
Topic
Type