Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Robab Afshari
Observed name:
R. Afshari
Institution:
University of Zanjan
Observed institutions:
Ferdowsi University of Mashhad,
University of Zanjan
ORCID:
0000-0003-4234-8366
Observed ORCID:
0000-0003-4234-8366
OpenAlex ID:
A5089563258
Optimal design of overall yield-based variable repetitive sampling plans for processes with multiple characteristics
2019
·
Adel Ahmadi Nadi
, Bahram Sadeghpour Gildeh
, et al.
·
Applied Mathematical Modelling
·
35
Designing a Multiple Deferred State Attribute Sampling Plan in a Fuzzy Environment
2017
·
R. Afshari
, B. Sadeghpour Gildeh
·
American Journal of Mathematical and Management Sciences
·
20
Multiple Deferred State Sampling Plan with Fuzzy Parameter
2017
·
Robab Afshari
, Bahram Sadeghpour Gildeh
, et al.
·
International Journal of Fuzzy Systems
·
17
The effects of measurement errors on estimating and assessing the multivariate process capability with imprecise characteristic
2022
·
Robab Afshari
, Adel Ahmadi Nadi
, et al.
·
Computers & Industrial Engineering
·
16
Fuzzy multiple deferred state attribute sampling plan in the presence of inspection errors
2017
·
Robab Afshari
, Bahram Sadeghpour Gildeh
, et al.
·
Journal of Intelligent & Fuzzy Systems
·
15
Construction of fuzzy multiple deferred state sampling plan
2017
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Joint World Congress of International Fuzzy Systems Association and International Conference on Soft Computing and Intelligent Systems (IFSA-SCIS)
·
15
An optimal construction of yield-based EWMA repetitive multivariate sampling plan
2022
·
Robab Afshari
, Adel Ahmadi Nadi
·
Communication in Statistics- Theory and Methods
·
5
Control charts for monitoring relative risk rate in the presence of Weibull competing risks with censored and masked data
2023
·
Adel Ahmadi Nadi
, Robab Afshari
, et al.
·
Quality Technology & Quantitative Management
·
4
Fuzzy multiple deferred state variable sampling plan
2018
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Journal of Intelligent & Fuzzy Systems
·
4
A modified method on estimating and assessing the process yield with imprecise multiple characteristics
2020
·
Robab Afshari
, Bahram Sadeghpour Gildeh
, et al.
·
Iranian journal of fuzzy systems
·
2
Fuzzy Double Variable Sampling Plan
2019
·
Robab Afshari
, Bahram Sadeghpour Gildeh
, et al.
·
Iran International Industrial Engineering Conference (IIIEC)
·
1
The effects of misclassification errors on multiple deferred state attribute sampling plan
2018
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Journal of industrial and systems engineering.
·
1
Rectifying fuzzy multiple deferred state variable sampling plan
2018
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Iranian Joint Congress on Fuzzy and Intelligent Systems
·
1
Modified sequential sampling plan using fuzzy SPRT
2017
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Iranian Joint Congress on Fuzzy and Intelligent Systems
·
1
Analysis of the traffic structure of the roads of Chahar Mahal and Bakhtiari province using data-mining approaches
2025
·
Vahideh Ahrari
, Robab Afshari
·
Signal and Data Processing
PDF
Control charts for monitoring the capability of unstable process
2024
·
Robab Afshari
, Abbas Rasouli
, et al.
·
Communications in Statistics - Simulation and Computation
Improving Multiple Dependent State Sampling Plan Based on Capability Index S^T_pk
2022
·
Robab Afshari
·
Journal of Statistical Sciences
On the rectifying multiple deferred state plan in the presence of uncertain parameter
2020
·
Robab Afshari
, Bahram Sadeghpour Gildeh
·
Journal of Intelligent & Fuzzy Systems
Fuzzy Double Variable Sampling Plan
2020
·
Robab Afshari
, Bahram Sadeghpour Gildeh
, et al.
Show more works
View as search
Works count:
19
Citation count:
137
H-index:
6
I10-index:
6
Year
Topic
Type