Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Suyanto
Observed name:
Suyanto Suyanto
Institutions:
Institut Teknologi Sepuluh Nopember,
National Research and Innovation Agency
Observed institutions:
Institut Teknologi Sepuluh Nopember,
Badan Pengkajian dan Penerapan Teknologi,
National Research and Innovation Agency
ORCID:
0000-0003-1713-135X
Observed ORCID:
0000-0003-1713-135X
OpenAlex ID:
A5096825257
Design, Construction and Preliminary Test Operation of BPPT-3MW Condensing Turbine Geothermal Power Plant
2019
·
Bambang Teguh Prasetyo
, Suyanto
, et al.
·
Evergreen
·
27
Lesson learned – The operation of the pilot scale geothermal power plant 3MW – Kamojang, Indonesia
2020
·
Bambang Teguh Prasetyo
, Suyanto
, et al.
·
Geothermics
·
16
Testing of Early Stage of BPPT-3MW Condensing Type Small Scale Geothermal Power Plant – Kamojang - Indonesia
2019
·
Bambang Teguh Prasetyo
, Suyanto
, et al.
·
Journal of Physics Conference Series
·
4
PDF
Effectiveness of Reducing GHG Emissions With Fuel Conversion in Gas and Steam Power Plant PT PLN UPDK Belawan, North Sumatera
2024
·
Isra Suryati
, Randy Zulkarnain
, et al.
·
DINAMIS
·
1
PDF
Performance pressure control system for inlet turbine using neural network backpropagation and NARX model in the geothermal power plant 3 MW Kamojang-Indonesia
2024
·
Junanto Prihantoro
, Suyanto
, et al.
·
AIP conference proceedings
·
1
Field-validated thermodynamic assessment of hybrid gas-removal systems for geothermal power plants
2026
·
Suyanto
, Triyogi Yuwono
, et al.
·
Geothermics
Water jet ejectors as a sustainable alternative to steam-based systems for NCG removal in geothermal power plants: Advances, applications, and future directions (2015–2025)
2026
·
Suyanto
, Yuwono Triyogi
, et al.
·
Geothermics
Optimizing small-scale geothermal power: insights from long-term testing and system modifications of a 3 MW geothermal condensing power plant in Kamojang, Indonesia
2026
·
Lina Agustina
, Suyanto Suyanto
, et al.
·
International Journal of Power Electronics and Drive Systems/International Journal of Electrical and Computer Engineering
PDF
Investigating the reasons of main steam pressure drop in the main pipe of performance test geothermal power plant of 3 MW Kamojang Indonesia
2024
·
Imaduddin Haq
, Shandi Prio Laksono
, et al.
·
AIP conference proceedings
Show more works
View as search
Works count:
9
Citation count:
49
H-index:
3
I10-index:
2
Year
Topic
Type