Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Chin-Chih Chang
Observed name:
C. C. Chang
Institution:
Takming University of Science and Technology
Observed institutions:
National Yang Ming Chiao Tung University,
National Taiwan University of Science and Technology,
Providence University,
Takming University of Science and Technology,
Hubei University for Nationalities,
Chung Hua University
show all 6
ORCID:
0000-0003-1092-914X
Observed ORCID:
0000-0003-1092-914X
OpenAlex ID:
A5102714884
A simulated annealing algorithm for manufacturing cell formation problems
2007
·
Tai-Hsi Wu
, Chin-Chih Chang
, et al.
·
Expert Systems with Applications
·
144
Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair
2013
·
Chin-Chih Chang
·
Computers & Industrial Engineering
·
102
An efficient approach to determine cell formation, cell layout and intracellular machine sequence in cellular manufacturing systems
2013
·
Chin-Chih Chang
, Tai-Hsi Wu
, et al.
·
Computers & Industrial Engineering
·
84
An Extended Periodic Imperfect Preventive Maintenance Model With Age-Dependent Failure Type
2009
·
Shey-Huei Sheu
, Chin-Chih Chang
·
IEEE Transactions on Reliability
·
77
Optimal preventive maintenance and repair policies for multi-state systems
2015
·
Shey-Huei Sheu
, Chin-Chih Chang
, et al.
·
Reliability Engineering & System Safety
·
75
Hybrid simulated annealing algorithm with mutation operator to the cell formation problem with alternative process routings
2008
·
Tai-Hsi Wu
, Shu-Hsing Chung
, et al.
·
Expert Systems with Applications
·
75
An efficient tabu search algorithm to the cell formation problem with alternative routings and machine reliability considerations
2010
·
Shu-Hsing Chung
, Tai-Hsi Wu
, et al.
·
Computers & Industrial Engineering
·
71
A water flow-like algorithm for manufacturing cell formation problems
2010
·
Tai-Hsi Wu
, Shu-Hsing Chung
, et al.
·
European Journal of Operational Research
·
56
Optimal number of minimal repairs before replacement based on a cumulative repair-cost limit policy
2010
·
Chin-Chih Chang
, Shey-Huei Sheu
, et al.
·
Computers & Industrial Engineering
·
52
A hybrid heuristic algorithm adopting both Boltzmann function and mutation operator for manufacturing cell formation problems
2009
·
Tai-Hsi Wu
, Chin-Chih Chang
, et al.
·
International Journal of Production Economics
·
40
A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul
2010
·
Shey-Huei Sheu
, Suh-Huey Li
, et al.
·
International Journal of Systems Science
·
39
Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
2012
·
Chin-Chih Chang
, Shey-Huei Sheu
, et al.
·
Applied Mathematical Modelling
·
32
Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
2009
·
Yu-Hung Chien
, Shey-Huei Sheu
, et al.
·
International Journal of Systems Science
·
32
A multi-criteria optimal replacement policy for a system subject to shocks
2011
·
Chin-Chih Chang
, Shey-Huei Sheu
, et al.
·
Computers & Industrial Engineering
·
31
Optimal age replacement scheduling for a random work system with random lead time
2018
·
Chin-Chih Chang
·
International Journal of Production Research
·
30
A note on replacement policy for a system subject to non-homogeneous pure birth shocks
2011
·
Shey-Huei Sheu
, Chin-Chih Chang
, et al.
·
European Journal of Operational Research
·
28
Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
2010
·
Yu-Hung Chien
, Chin-Chih Chang
, et al.
·
Annals of Operations Research
·
28
Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
2011
·
Shey-Huei Sheu
, Chin-Chih Chang
, et al.
·
Annals of Operations Research
·
24
A Periodic Replacement Model Based on Cumulative Repair-Cost Limit for a System Subjected to Shocks
2010
·
Shey-Huei Sheu
, Chin-Chih Chang
, et al.
·
IEEE Transactions on Reliability
·
22
A Bivariate Optimal Replacement Policy for a System With Age-dependent Minimal Repair and Cumulative Repair-cost Limit
2013
·
Chin-Chih Chang
, Shey-Huei Sheu
, et al.
·
Communication in Statistics- Theory and Methods
·
21
Extended periodic imperfect preventive maintenance model of a system subjected to shocks
2010
·
Shey-Huei Sheu
, Chin-Chih Chang
·
International Journal of Systems Science
·
20
Optimal Number of Repairs Before Replacement for a System Subject to Shocks of a Non-Homogeneous Pure Birth Process
2013
·
Shey-Huei Sheu
, Yen-Luan Chen
, et al.
·
IEEE Transactions on Reliability
·
17
A note on a two variable block replacement policy for a system subject to non-homogeneous pure birth shocks
2015
·
Shey-Huei Sheu
, Yen-Luan Chen
, et al.
·
Applied Mathematical Modelling
·
16
PDF
Optimal preventive policies for imperfect maintenance models with replacement first and last
2015
·
C. C. Chang
·
Communication in Statistics- Theory and Methods
·
13
Extended optimal replacement policy for a system subject to non-homogeneous pure birth shocks
2012
·
Shey-Huei Sheu
, Yen-Luan Chen
, et al.
·
Computers & Industrial Engineering
·
13
Show more works
View as search
Works count:
56
Citation count:
1,292
H-index:
20
I10-index:
32
Year
Topic
Type