Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Jeff S. Shepard
Observed names:
J. S. Shepard,
J. Shepard,
Jeff Shepard,
Jeffrey Scott Shepard
OpenAlex ID:
A5109080113
Advanced Slip Crushing Considerations for Deepwater Drilling
2002
·
U. B. Sathuvalli
, M. L. Payne
, et al.
·
SPE/IADC Drilling Conference
·
18
Next Generation Drill Pipe for Extended Reach, Deepwater and Ultra-deep Drilling
2003
·
Michael J. Jellison
, Mike L. Payne
, et al.
·
Offshore Technology Conference
·
15
Ultradeep Drilling Pushes Drillstring Technology Innovations
2008
·
Michael J. Jellison
, R. Brett Chandler
, et al.
·
SPE Drilling & Completion
·
12
Severe Downhole Frictional Heating Driving Increase in Drillstring Failures
2007
·
Michael J. Jellison
, Lucien Hehn
, et al.
·
All Days
·
9
Advanced Slip-Crushing Considerations for Deepwater Drilling
2002
·
U. B. Sathuvalli
, M. L. Payne
, et al.
·
SPE Drilling & Completion
·
8
Ultradeep Drilling Pushes Drillingstring Technology Innovations
2007
·
Michael J. Jellison
, R. Brett Chandler
, et al.
·
SPE Middle East Oil and Gas Show and Conference
·
7
The Effect of Increased Make-up Torque on Performance of Rotary Shouldered Connections
2005
·
Jim Breihan
, Andrei Muradov
, et al.
·
All Days
·
7
Performance Driven Drilling Tubular Technologies
2003
·
R. Brett Chandler
, Michael J. Jellison
, et al.
·
SPE/IADC Drilling Conference
·
7
Challenging Drilling Applications Demand New Technologies
2007
·
M. Jellison
, R.B. Chandler
, et al.
·
International Petroleum Technology Conference
·
6
Drillstring Technology Vanguard for World-Class Extended-Reach Drilling
2007
·
Michael J. Jellison
, R. Brett Chandler
, et al.
·
Offshore Technology Conference
·
5
Catastrophic Drill String Failures Caused by Downhole Friction Heating -An Increasing Trend
2007
·
Lucien Hehn
, Michael J. Jellison
, et al.
·
All Days
·
5
Challenging Drilling Applications Demand New Technologies
2007
·
Michael J. Jellison
, Raymond Brett Chandler
, et al.
·
All Days
·
3
What Difference Does Internal-Taper Length Make on Drillpipe Fatigue Life?
1994
·
G. E. Wilson
, J. S. Shepard
·
SPE Drilling & Completion
·
3
Drill pipe management extends drillstring life
1991
·
Jeffrey Scott Shepard
·
Oil & gas journal/Oil and gas journal
·
2
Preventive Maintenance and the Drilling Contractor
1989
·
J. S. Shepard
·
SPE/IADC Drilling Conference
·
1
Challenging Drilling Applications Demand New Technologies
2007
·
Michael J. Jellison
, Raymond Brett Chandler
, et al.
·
International Petroleum Technology Conference
Design, arrangement of rig floor tugger derrick sheave blocks change-as drilling goes deeper
2006
·
Jeff Shepard
·
Drilling contractor
Show more works
View as search
Works count:
17
Citation count:
108
H-index:
7
I10-index:
3
Year
Topic
Type