Product
Help
Pricing
About
Jobs
Log in
Get started
Author
Add to collection
Yishu Fu
Institution:
State Grid Liaoning Electric Power Company (China)
Observed institution:
State Grid Liaoning Electric Power Company (China)
ORCID:
0009-0009-5756-2243
Observed ORCID:
0009-0009-5756-2243
OpenAlex ID:
A5130466609
Optimization management of construction duration-cost for prefabricated substations based on BIM
2026
·
Chao Ge
, Ping Zhang
, et al.
·
International Conference on Water Conservancy, Hydropower, and Building Engineering (WCHBE)
Life Cycle Cost Prediction for Substations Using LSSVM Optimized by PSO
2026
·
Chao Ge
, Weimao Xu
, et al.
·
International Conference on Electrical Engineering, Intelligent Control and Artificial Intelligence (EEICAI)
Research on Substation Construction Project Progress Prediction Based on Random Forest
2026
·
Chao Ge
, Ping Zhang
, et al.
·
International Conference on Electrical Engineering, Intelligent Control and Artificial Intelligence (EEICAI)
Research on Component Level Measurement and Pricing Model of Power Engineering Based on BIM Technology
2025
·
Chao Ge
, Weimao Xu
, et al.
·
International Conference on Computational Modeling, Simulation and Data Analysis (CMSDA)
Study on Multi-Objective Optimization of Construction Period and Cost for Prefabricated Substations Based on ANN and BIM
2025
·
Chao Ge
, Ping Zhang
, et al.
·
International Conference on Big Data, Artificial Intelligence and Risk Management (ICBAR)
Research on a Component-Level Measurement and Valuation Model for Prefabricated Substations Based on BIM and Quota
2025
·
Chao Ge
, Ping Zhang
, et al.
·
International Conference on Data Management and Computer Science (ICDMCS)
Show more works
View as search
Works count:
6
Citation count:
H-index:
I10-index:
Year
Topic
Type