Year: 2010
Type: conference-paper
Abstract: TET-1 is a satellite intended for verification of new space hardware and scheduled for launch end of this year.The German Space Operations Center is responsible for preparation and operations execution for this satellite.Routine operations are driven by the requirements of 11 payloads, which are significantly different.Operations are split in two different phases, a one year initial routine operations phase and an optional extended operations phase, the focus of the both is different.An operations concept has been jointly developed by GSOC together with Kayser-Threde.This concept comprises elements like the selected routine operations network, the design of the system for payload operations (NVS) as well as payload data immediate storage and dump concept.During the planned first year of operations all 11 payloads are operated with the goal of payload verification under space conditions.Routine operations cycles are planned on an orbit by orbit cycle within a spread sheet developed by KTH.All activities for the first year are already planned at the start of the phase.This data is automatically read into the mission operations system of GSOC and adapted for daily satellite operations.A variety of different tools is used for generation and modification of the command sequences, either manually or automatically.These tools are mostly used as heritage from other GSOC missions.For some payloads special operations requirements apply, like a 180° rotation around nadir axis for thermal and attitude determination reasons.Other payloads require operations at a certain attitude during several orbits challenging the power subsystem by a disadvantageous sun incidence angle for the solar generator.All these requirements are taken into account when generating the timeline.During the possible extension phase only a subset of all payloads is operated and the operations requirements are changed compared to the first year.The driving payload for this phase is an infrared camera assembly, similar to a camera already flown on the BIRD satellite.In this phase mission operations is adapted to the requirements of this camera.Operations are driven by the requirement of short reactions times to camera interesting events like hot spots.Furthermore power and data constraints must be obeyed by the mission operations group.
Source: elib (German Aerospace Center)
Authors: Robert Axmann, Peter Mühlbauer, Andreas Spörl, Michael Turk, Stefan Föckersperger, Jürgen Schmolke
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W106648679
