A Reliability Improvement Program Planning Report for the SNAP 10A Space Nuclear Power Unit
Year: 1961
Type: report
Abstract: The estimated achieved reliability of SNAP 10A space nuclear power units will be relatively low at the timeof the first SNAPSHOT flight test in April 1963 and the existing R&D program does not provide a significant reliabiity growth thereafter. The total costs of an 8-satellite network using SNAP 10A units over a 5-year period has been approximated for the case where the total cost of a single satellite launched is 8 million dollars.
Authors: M.G. Coombs, Carlyle Smith, LeslieA. Wilson
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W107335253
