Year: 2015
Type: preprint
Abstract: Advance Mitigation and the Role of Transportation Funding in its RealizationAdvance mitigation can be defined as a process in which the impacts from one or many transportation projects are estimated and addressed before or during the planning phase.Further, advance mitigation involves assessment of the mitigation that will likely be required and, potentially, mitigation activities to satisfy those requirements.Advance mitigation is characterized by several key attributes:1. Strategic Planning and assessment of what impacts multiple future transportation projects may have in a region and of mapped regional priorities for conservation/restoration, here called a Greenprint.2. No Temporal Loss to ensure that the required compensatory mitigation is in place before actual impacts to the environment occur, preventing any temporary loss of biological or ecological resources.3. Advance Funding to support mitigation activities early or prior to construction of transportation projects, and hence even prior to projects being programmed.This study, the Statewide Advance Mitigation Funding and Finance Study (SAMFFS), acknowledges that advance mitigation requires that mitigation must be considered, purchased, and implemented early in the project planning process, well prior to construction.Within Caltrans' own project delivery process, advance mitigation would be undertaken before the Project Initiation Document (PID) milestone, rather than after it; as is conventional in current practice.The current approach to funding projects and mitigation together presents a significant roadblock to mitigating environmental impacts early and comprehensively.In California and most other U.S. states, funding for transportation improvements and mitigation of their impacts is tied directly to individual projects themselves.Under normal circumstances, the budget of a single transportation project is what pays for the acquisition, design, restoration, construction, enhancement, and even long-term management of its mitigation sites.Funds budgeted or anticipated for a specific project are available for actual expenditure only once the project is "programmed," when the time available before construction would begin is relatively short and frequently inadequate for addressing mitigation needs, often leading to cost escalation and delay.Further, tying mitigation funds to single-project budgets makes it difficult to entertain mitigation activities scaled to satisfy the needs of multiple projects at once, limiting opportunities to achieve economies of scale and employ conservation strategies.To overcome this roadblock, funds for mitigation are needed prior to projects being programmed.This indicates that funds for advance mitigation may need to be programmatic, rather than being funded from projects, as is the usual method of conducting mitigation.Thus, the SAMFFS study aims to identify and assess ways to programmatically fund statewide advance mitigation of California transportation projects.This report, "Setting the Stage for Statewide Advance Mitigation in California," provides a review of the financial approaches to funding advance mitigation that have been used in local, state, and national efforts.The material will inform later SAMFFS tasks and ultimately Caltrans' own considerations in developing options to implement this innovative approach. Key elements of this report include:1. Discussion of impetus for and potential benefits of advance mitigation, indicated in the literature;Funding details are sparse.In spite of interest in advance mitigation, few studies or reports of these efforts detail the architecture of funding mechanisms.Some program evaluations show savings are available through such an approach, with many detailed in other sections of this report.However, details on the sources of the funding, and whether funding derived from project funds, was programmatically allocated by a transportation agency, or was derived from an external source, are scarce.Interest in advance mitigation has come largely from ecologists.The majority of studies informing the practice of advance mitigation have come from the ecological sciences, and from the emerging subdiscipline of road ecology.These works address the adverse impacts of transportation infrastructure on the natural environment, including mortality to species hit by vehicles, reduced dispersal capacity, and impediments to gene flow.Road use increases the spread of invasive species, generates noise that affects breeding birds, generates greenhouse gas emissions, and contributes to such indirect effects as the road effect zone and landscape fragmentation.Finding a balance between infrastructure development and preservation of open space for biodiversity conservation, ecosystem processes, agriculture, and other needs is most effectively addressed at a landscape (regional) level. Vivid figures suggest advance mitigation may offer financial benefits.In addition to ecological motives, the literature suggests compelling practical reasons for transportation agencies to engage in advance mitigation.Vivid numbers emerge from various sources about the potential for improving efficiencies and economies of scale over current project-based mitigation practice, lowering costs and delay:In one national study, 65% of DOTs surveyed had experienced environmental-related delay. The median delay from environmental factors was 12 months. In a study of 4,090 Caltrans projects programmed from 2002-2004, projects were more likely to have an environmental allocation (44%) than an actual environmental expenditure (35%). Of projects incurring such expenditures, 61% expended more for environmental than allocated. The cost of environmental delays to Caltrans was calculated in 2004 as $59 million per year. The exact length of and causes of environmental review related delay are not well understood, but some reports suggest these processes may add up to 10 to 15 years to project delivery.5 Some states that have undertaken more comprehensive or advance mitigation report savings. Programmatic permitting of bridges, via establishment of standards, an environmentally proactive approach, and up front planning, has saved $72 million in Oregon. Michigan Department of Transportation (MDOT) reduced the cost of wetland mitigation from previously typical costs between $75,000 and $150,000 per acre to roughly $25,000 and $30,000 per acre, using statewide wetland mapping and a mitigation site suitability index, and by funding mitigation separately from projects (Environmental Law Institute 2010). By establishing three wetland mitigation banks and restoring one larger site instead of many smaller sites, Washington State Department of Transportation (WSDOT) achieves economies of scale cost savings between 30% and 80% over the cost of traditional, project-by-project, mitigation. California Experiences with Advance MitigationThe Caltrans Staff Working Group (SWG) identified a set of 10 in-state efforts to undertake mitigation on an advanced basis.We performed a detailed review of each effort to uncover: the funding, revenue sources, or financial options used to support advance mitigation; administrative, legislative, or institutional actions that facilitated advance mitigation; data, where available, on costs or benefits attributed to an advance mitigation approach; and lessons learned from the project or experience. Categories of Approaches in California.While the individual project histories represented in these 10 efforts are diverse, three natural groupings emerge as a way to consider broad similarities among them.
Language: English
Subfield: Management, Monitoring, Policy and Law
Field: Environmental Science
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W1139061237