Work

Performances obtained with the CERN Linear Collider Test Facility (CTF)

Year: 1994
Type: article
Abstract: 1994 European Particle Accelerator Conference, Iune 27-]uly 1, 1994, London, accelerating section, due to wake fields and space charge effects are discussed.with computations. The limitations encountered due to beam loading in the gun and 209 or 262 nm and the beam lay out. Beam perfomiances obtained are presented and compared and the different photo-cathodes used, the laser system producing trains of ps long pulses at position monitors. The main components of the CTF will be briefly described: the 3 GHz gun generation of 30 GHz power with a structure excited by the bunch train and the testing of beam production of a train of high charges short electron bunches with a laser driven rf gun, the The C'I` F serves to study some aspects of a pos sible future two-beam linear collider such as the
Language: English
Open Access status: green
OpenAlex ID: W117154264
FWCI: 0.855
Cites: 5
Cited by: 8
Related to: 10