Work

Propagation of weather forecast uncertainties in flood forecasting. A case study on Rhine discharges at Lobith

Year: 2004
Type: dissertation
Abstract: Weather uncertainties can cause a substantial uncertainty in flood predictions in the Rhine basin. Weather predictions become important when forecast periods extend and the effects of previously released rainfall and resulting discharges from it, are fading out. In the Rhine basin, this happens especially when lead times become greater than 2 days. Uncertainties in hydrological processes are therefore dominant in the first 2 days of discharge predictions in the Rhine, but after this period, uncertainties caused by weather uncertainties become important. Endeavours are made to extent the lead times of discharge predictions in the Rhine to 4 days. This means that weather forecasts and uncertainties in weather forecasts become important. A forecast tool called FEWS-Rhine was developed by WL | Delft Hydraulics to compute discharge predictions from a combination of weather predictions and upstream discharge measurements. This study contributes to the knowledge about how to handle uncertainties in flood predictions in the Rhine basin caused by weather uncertainties. The objective of this study is therefore to find out which weather uncertainties cause substantial variations in the discharge predictions at Lobith. Since computation of probabilistic weather forecasts in FEWS-Rhine are time consuming, an effective approach was looked for to take weather uncertainties into account in flood predictions. The forecasting tool FEWS-Rhine was used as material to produce forecasts. A literature review on weather forecasts and the influence of uncertainty of weather characteristics on discharge predictions was conducted. It turned out that large scale verification of weather models is mostly done by comparing monitored accumulated precipitation numbers with forecasted accumulated precipitation numbers. Small scale verification requires the reckoning with location errors since the location of precipitation becomes more important when scale reduces. Uncertainty in weather predictions is mostly mapped by an Ensemble Prediction System (EPS) which provides a weather forecast with additional (mostly lower resolution) forecasts using perturbed initial conditions called ensemble members. Results of the EPS of ECMWF were available for study. This EPS produces 50 members, forecasting 10 days ahead. The performance of precipitation forecasts in EPS is highly dependent on the precipitation predicted and on the season: a large amount of rain is mostly underestimated; performance is less in summer than in winter because of the more chaotic behaviour of summer weather systems. Especially uncertainties in intensity and location of precipitation are important for discharge predictions in small catchments. A higher intensity causes higher peaks in the discharge prediction. Location uncertainties of fronts can influence the intensity because intensity is dependent on the orography of the area in which it falls. These uncertainties were investigated for the Rhine basin in this study. In a previous study [Van den Dool, 2004], discharge simulations on the Rhine basin were performed by making parameterized fronts in a MATLAB tool and releasing them on FEWS-Rhine. Especially the influence of the direction and velocity of fronts on discharges at Lobith was investigated. The outcome was that the influence of direction and velocity of fronts becomes important when they approach the flood wave direction (thus move downstream) and celerity. This is caused by the fact that the front coincides with the flood wave. However, it was also shown that regular fronts never move in downstream direction and also move in a higher order velocity than the wave celerity. In this research, more simulations with parameterized fronts were performed with emphasis on variation in precipitation intensity and location of the fronts. The simulations showed that when fronts follow each other at close distance, the Rhine basin reacts faster and produces higher peaks. Furthermore a location uncertainty of a front as large as the distance between two sub-basins can cause precipitation to fall either in one sub-basin or in the other. Finally, low resolution data can cause rain that is in reality falling very locally in a sub-basin of the Rhine catchment to fall partly outside the catchment or in another sub-basin. An EPS forecast of January, 21st 1995 was computed in FEWS-Rhine. After 5 days the EPS members deviate so much that the precipitation fields are not comparable anymore. The uncertainty in EPS appears to occur at the scale of a total weather system, which is far greater than the size of the Rhine basin. Computation of the influence of weather uncertainties on discharge prediction is therefore not possible by using a small scale verification procedure on the characteristics of fronts and linking this to the discharge resulting from it. Instead, a hydrological approach was needed, but requiring a much smaller amount of time than FEWS-Rhine, to compute discharge uncertainties due to weather uncertainties from EPS forecasts effectively. A regression equation including solely preceding daily accumulated precipitation numbers proved to contain too little information to give estimations of discharge numbers. Only the shape of the hydrograph could be recognized. More information could be included in a simple hydrological model. The following simplifications were made in comparison with FEWS-Rhine: The model gives daily discharge values instead of hourly. The SOBEK River routing procedure was replaced by a regression equation including discharges in sub-basins upstream from Lobith at a preceding time equal to an approximation of the travel time of waves from the upstream point to Lobith. The discharges from the sub-basins were produced by simple conceptual rainfall runoff models based on the HYMOD model structure. A snow routine was included. The assumption was made that there is a certain amount of auto-correlation between discharges of neighbouring sub-basins because of correlations between hydrological characteristics and meteorology. Therefore, only a few sub-basins were iteratively included in the regression equation: the Lippe, Mosel and Neckar. The sub-basins chosen are well spread over the Rhine basin which supports that they represent a good sampling of the Rhine catchment.
Language: English
Open Access status: green
OpenAlex ID: W119155482
Cites: 9
Cited by: 1
Related to: 10