Dynamic Production Plan of Probabilistic Market Demand and Fixed Selling Time With Unreliable Machines and Obtainable Working Hour Capacity
Year: 2001
Type: article
Abstract: Abstruct The Dytiam'L(; Productien Pian (DPP) ]v{odel for reaching an optimal corLtrol oftbe production undergeing the eonsideratio"s of probabilisLlc: market demand, rul,ure obtainable working hour capacity and unreliable rr)achines is propesed in this paper, IL can be applied t/o evaluate Lhe optimal production rate to reduce the i'isk in the future of uncertai]ty.It is also suggested that the time interval of production, rnaintena-ce cost of an unreliable machine, transaction, penalty, holding costs, sales price and the machine reliability should be taken into consic]erations.In addition, sensitivit/y nnalyses on the key variables of optimal solution are prcsented.Actua]ly, t,hi,s study ellicient]y providcs a, dynamie t,ool capablc ofcontrelling the preduction plan (ratc) at ariy ti[Jie for the production planner haying gr:eat insight.The Opeiations
DOI: 10.15807/jorsj.44.57
Authors: Miao-Sheng Chen, Chun-Hsiung Lan
Institutions: Nanhua University, Tamkang University
Language: English
Subfield: Management Information Systems
Domain: Social Sciences
Open Access status: bronze
OpenAlex ID: W121649040
