Work

Fisuracion Longitudinal De Elementos Pretensados Durante La Transferencia De La Fuerza De Pretensado. I. Parte Experimental

Year: 1999
Type: article
Abstract: The transmission length in prestressed beams depends on the concrete-steel bond and on the splitting action of the indented wire. This paper shows a novel testing procedure to evaluate the concrete-steel bond and its reaction with the splitting action of the pretensioned indented wire. 27 specimens, combining 3 covers and 3 indentation depths, have been tested. The deeper the indentation the best the concrete-steel bond if no cracking occurs. However, if splitting cracks appear, deeper indentations require a lower splitting load. Moreover, deeper indentations lead to wider crack opening, minor bond stress and longer transmission length.
Language: Spanish
Open Access status: hybrid
OpenAlex ID: W124604351
FWCI:
Cites:
Cited by: 2
Related to: 10