Work

Evaluation of the success of river restoration by using phytometers

Year: 2010
Type: dissertation
Abstract: Rivers in northern Sweden have been heavily exploited for timber transport during the floating era between 1850 and 1980.Water courses of all sizes running from mountains to coasts were reconstructed and boulders and woody debris were removed in order to achieve effective, fast flowing channels.This development was very important for the forest industry, but other goods and services connected to riverine ecosystems were affected by loss of biodiversity, degraded geochemical processes and less natural flows.Restoration of these rivers has been on the political agenda for 10-20 years, however, the designs of such measures have often been based on a trial and error practice due to lack of knowledge about previous states, feasible techniques, and ecosystem recovery.One fundamental question needs to be answered: given a certain amount of money, where should this be spent to provide the most efficient result?In other words: are there locations in the landscape that are more appropriate than others for restoration measures?This study investigated the efficiency of restoration along the Vindel River at different riverbank levels.I used three phytometers as indicators of productivity and transplanted them to restored and nonrestored sites along a stream order gradient and a climate gradient.The phytometers were harvested after one and two years, respectively.The results indicate that local variations (i.e. between sites) have larger impact on productivity than regional variations (i.e. the gradients).There was no consistent difference in productivity between restored and non-restored sites.Restoration measures were conducted about four years prior to my study which is likely not sufficient for the biota to adapt to new conditions.The conclusion of this study is that longer-term studies after restoration are needed before we can answer the questions about which restoration efforts are the most effective.One key point is the rehabilitation time needed to show the more final results of a restoration on plant productivity.
Language: English
Open Access status: green
OpenAlex ID: W126678804
Cites: 26
Cited by:
Related to: 10