Infrastructure Reform and Regulation: Lessons from Brazil

Type: preprint
Abstract: ► ► Competition in generation never materialized Competition in generation never materialized ► ► Wholesale market never worked Wholesale market never worked ► ► Lack of adequate planning and coordination Lack of adequate planning and coordination ► ► Bad timing Bad timing Privatizations started in 1995; ANEEL was not fully Privatizations started in 1995; ANEEL was not fully established before 12 established before 12/ /1997; MAE was established in 1997; MAE was established in 05/98 (not functional before 2000) 05/98 (not functional before 2000) ► ► Consequences: Consequences: Energy shortage (06 Energy shortage (06/ /2001 2001 --02/2002) 02/2002) GDP growth only 1% in 2001 (projected 4%) GDP growth only 1% in 2001 (projected 4%)