Work

High intensity proton operation at the Brookhaven AGS accelerator complex

Year: 1994
Type: conference-paper
Abstract: With the completion of the AGS rf upgrade, and the implementation of a transition {open_quotes}jump{close_quotes}, all of accelerator systems were in place in 1994 to allow acceleration of the proton intensity available from the AGS Booster injector to AGS extraction energy and delivery to the high energy users. Beam commissioning results with these new systems are presented. Progress in identifying and overcoming other obstacles to higher intensity are given. These include a careful exploration of the stopband strengths present on the AGS injection magnetic porch, and implementation of the AGS single bunch transverse dampers throughout the acceleration cycle.
Language: English
Open Access status: green
OpenAlex ID: W147220000
FWCI: 6.939
Cites: 3
Cited by: 2
Related to: 10