Year: 2008
Type: conference-paper
Abstract: A well as preliminary results of beam studies are presented.resolution in the 100 nm ut nd calibration s, based on the commercial Echotek digital nd an EPICS interface to the ATF control re units, rather than implementing the latest generation of digital signal processing technology c, damping ring and extraction line, as of year 2008 PM stations.Tabl a in parameters bstract A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort.The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital donwconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema.The technical concept and realization, as ____________________________________________
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
Funder: U.S. Department of Energy
Awards: G2371548206, G303061748, G5570207115
OpenAlex ID: W1483635809
