Work

Sistemas de gestão integrados: desenvolvimento de um modelo para avaliação do nível de maturidade

Year: 2013
Type: dissertation
Abstract: Integration is defined as “the act or process of making whole or entire” and System defined as “an interrelated elements array, such as processes, using several resources to achieve set goals”. Human organizations take a lot of work in order to defy basic physics laws namely entropy. The visible “iceberg peak” of this subtle war against organizations disorder trend are the management systems. The most commonly reported subsystems combined into a single Integrated Management System (IMS) are the Quality Management System (QMS) implemented according ISO 9001 standard, the Environmental Management System (EMS) implemented according ISO 14001 standard and the Occupational Health and Safety Management System (OHSMS) implemented according OHSAS 18001 standard. The main objective of this thesis is to analyse all management systems integration phenomenon, to identify open research paths and to present solutions, namely, through a model development aiming at IMS maturity assessment. The thorough literature review undertaken, focused on open questions identification related to IMS and maturity models, depicted some unanswered questions, some with diffuse answers and some questions never made. The initial literature review allowed the development of the surveys focused on the organizations and on the selected academic and industry experts being this methodology the thesis corner stone. A back office and front office based maturity model development assessing IMS was the ultimate contribution from this thesis. This contribution, on its own, and sustained on multi-methodological tasks, allowed some other contributions, namely, the macro analysis of the management systems integration phenomenon worldwide, macro-indicators development and their evaluation by comparison with other indicators based on different sources. Some alternative methodologies adopted on results analysis contributed on some issues raised by several authors, namely, by confirming the relation between IMS implementation initial motivation and the benefits collected afterwards. Additionally, the QMS reposition after the integration process was assessed and three main strategies were identified. This identification enables top management with crucial information aiming at an integration successful process. Literature review allowed also external concepts identification that relates to IMS maturity. Topics like life cycle management and assessment, macroergonomics, sustainability and social accountability should be taken into account, enabling a deeper integration, and a more mature IMS. The results promoted several critical success factors identification that should be considered when integrating management subsystems. Some characteristics intrinsically related to high integration level organizations and low integration level organizations were identified. It was possible to conclude that management systems integration phenomenon is characterized by the high number of variables involved. The adopted strategy, the implementation process, the audit typology, the IMS typology, the motivation, the benefits, the obstacles and the achieved integration level are among those variables. Through macro-indicators development aiming the IMS dispersion worldwide analysis one may conclude that they evolved positively and increased in number during the time period between 1999 and 2011. At a national level, it is possible to conclude that the organizations that developed an IMS are mostly located at the North, Centre and Lisbon regions. The integrated QMS, EMS and OHSMS is the IMS typology mostly adopted. The results collected from the survey among academic and industry experts allowed the identification of high integration level organizations. According to these results, the development and adoption of the same tools and methodologies by each subsystem and objectives alignment, processes monitoring based in integrated indicators are evidences of a maximum integration level. The maturity model final version allows the conclusion that three variables contribute the mostly to the “IMS Maturity” latent variable. Those variables are the integrated vision by top management, the integration level classification and the audit typology. External concepts and the eight excellence management pillars relate also to the IMS maturity.
Institution: University of Minho
Language: Portuguese
Open Access status: green
OpenAlex ID: W149208553
Cites: 265
Cited by: 13
Related to: 10