Construction of the Longest Cut & Cover Tunnel in the Middle East(Superstructure;Two Span Continuous Pretension PSC Girder Bridge Type)
Year: 2013
Type: article
Source: 콘크리트학회지
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W1500980475
