Development of a catchment/landscape erosion prediction model (MINErosion 4) for post-mining landscapes in Central Queensland, Australia
Year: 2010
Type: conference-paper
Abstract: Open-cut coal mining in Central Queensland involves the breaking up of overburden that overlies the coal seams using explosives, followed by removal with draglines which results in the formation of extensive overburden spoil-piles with steep slopes at the angle of repose (approximately 75 % or 37o). These spoil-piles are found in long multiple rows, with heights of up to 60 or 70 m above the original landscapes. They are generally highly saline and dispersive and hence highly erosive. Legislation requires that these spoil-piles be rehabilitated into a stable self sustaining ecosystem with no off-site pollution.
Source: Griffith Research Online
Institution: Griffith University
Language: English
Subfield: Soil Science
Domain: Life Sciences
SDG: Life on land
Open Access status: green
OpenAlex ID: W1508719958
