Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck
Work
Year: 2007
Type: article
Institution Shanghai Jiao Tong University
Cites: 11
Cited by: 27
Related to: 10
FWCI: 3.176
Citation percentile (by year/subfield): 94.4
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Sustainable Development Goal Decent work and economic growth
Open Access status: closed