Work

Shop-Floor Control For Batch Operations With Time Constraints In Wafer Fabrication

Year: 2010
Type: article
Abstract: In wafer fabrications, engineers will set a queue time limit between particular operations to ensure the final product yield, which is named “time constraint. ” Due to the dilemma of increasing machine efficiency or decreasing the queue time of WIP, time constraint issues become more complex in batch processing. This work proposed a shop-floor control policy in serial-batch-serial processes with time constraints. The concept of safety stock ([S,s] policy) is introduced to control the WIP level, simultaneously avoiding machine idle and wafers exceeding time constraints. Length of time constraints, MTTR of machines and service rate of workstations are adopted to determine the batch size and boundaries of the WIP level. The job hold/release policy is addressed to control situations of excessively high WIP levels. Furthermore, the performances of the proposed model are compared with DJAH and MBSX rules. The results indicate that the proposed model could control the batch processing with time constraints more effectively.
Language: English
Open Access status: diamond
OpenAlex ID: W1520148645
FWCI: 0.593
Cites: 14
Cited by: 3
Related to: 10