Year: 2002
Type: report
Abstract: This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.
DOI: 10.2172/797810
Institution: National Energy Technology Laboratory
Language: English
Subfield: Process Chemistry and Technology
Field: Chemical Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W1529184125
