Work

Performance of a coal-gas-cleanup process-evaluation facility

Year: 1982
Type: article
Abstract: A coal gasification combined cycle process evaluation facility has been operated. The gas cleanup process, which contains the major functional elements of a commercial low temperature gas cleanup process has been evaluated. The critical unit operations, which include H/sub 2/S removal with a Benfield acid gas scrubbing system, particulate scrubbing, and condensate reutilization have been evaluated. Results indicate that all functional, environmental, and gas turbine specifications can be met.
Authors: D. Rib, Shoichi Kimura, David Smith
Language: English
Subfield: Fuel Technology
Field: Energy
Open Access status: green
OpenAlex ID: W154596641
FWCI:
Cites:
Cited by: 1
Related to: 10