Improving Onsite Scheduling: Looking Into the Limits of the Last Planner System

Year: 2013
Type: article
Abstract: Scheduling in onsite construction is complex. Last Planner System (LPS) has been successfully implemented at construction projects to handle variation and to increase schedule reliability. By focussing on fulfilment of preconditions to the individual activity the number of non-completions has decreased. In an attempt to refine the system and to build on to the success of LPS, the scheduling system has been studied and discussed. The research is based on four case studies which is combined with LPS theory. The research study revealed several areas in the existing scheduling system, which could be improved. The main finding has been the absence of flow, critical path, and slack when determining the sequence where only interrelationship and durations has been considered. Expanding the selection criteria’s will help improving the sequencing of activities and improve schedule reliability and increased productivity. Furthermore, it was found that comfort and motivation of the individual craftsman needs to be considered and handled, precautions to avoid congestions in the making ready process should be implemented, the soundness of ready work should continuously be controlled, and finally the output quality should be considered. Deliberate handling and rectifying the found weaknesses will improve the schedule quality and lead to increased schedule reliability and possibly onsite productivity.
Language: English
Open Access status: green
OpenAlex ID: W1561071389
FWCI: 1.778
Cites: 22
Cited by: 18
Related to: 10