Work

Experiences in the D&D of the EBWR reactor complex at Argonne National Laboratory

Year: 1995
Type: article
Abstract: EBWR went critical in Dec 1957 at 20 MW(t), was upgraded to 100 MW(t) operation. EBWR was shut down July 1967 and placed in dry lay-up. In 1986, the D&D work was planned in 4 phases: final planning and preparations for D&D, removal of reactor systems, removal of reactor vessel complex, and final decontamination and project closeout. Despite precautions, there was an uptake of {sup 241}Am by D&D workers following underwater plasma arc cutting within the pool; the cause was traced to an experimental {sup 241}Pu foil (200 {mu}g) that was lost in the mid-1960s in the reactor vessel. Several major lessons were learned from this episode, among which is the fact that research facilities often involve unusual experiments which may not be recorded. Safety analysis and review procedure for D&D operations need to be carefully considered since they represent considerably different situations than reactor operations. EBWR is one of the very few cases of a prototypic reactor facility designed, operated, tested and now D&D`d by one organization.
Language: English
Open Access status: green
OpenAlex ID: W1582295261
FWCI:
Cites:
Cited by:
Related to: 10