Year: 1997
Type: article
Abstract: Hybrid permanent magnets provide the magnetic fields for an anti- proton storage ring which is under construction at Fermilab. Using a combined function lattice, gradient magnets provide the bending, focusing and sextupole correction for the regular cells. Shorter magnets without sextupole are used in dispersion suppressor cells. These magnets use a 4.7 m ( 3 m) long iron shell for flux return, bricks of 25.4 mm thick strontium ferrite supply the flux and transversely tapered iron poles separated by aluminum spacers set the shape of the magnetic field. Central fields of 0.14 T with gradients of {approx}6%/inch ({approx}13%/inch) are required. Field errors are expected to be less than 10{sup -4} of the bend field over an aperture of {+-}40 mm (horizontal) {times} {+-}20 mm (vertical). Design, procurement, fabrication, pole potential adjustment, field shape trimming and measured fields will be reported.
Institution: Fermi National Accelerator Laboratory
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
Funder: Fermilab
OpenAlex ID: W1593587465
