Work

Status of the Oak Ridge 25 MV tandem accelerator

Year: 1980
Type: conference-paper
Abstract: A summary is given of the performance testing of the 25 URC Pelletron tandem at Oak Ridge National Laboratory during the period from October 1979 through October 1980. (GHT)
Language: English
Open Access status: green
OpenAlex ID: W1594101840
FWCI:
Cites:
Cited by:
Related to: 10