Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
Year: 2008
Type: article
Abstract: During hardware commissioning of the Large Hadron Collider (LHC), 8 main dipole circuits are tested at 1.9 K and up to their nominal current. Each dipole circuit contains 154 magnets of 15 m length, and has a total stored energy of up to 1.3 GJ. All magnets are wound from Nb-Ti superconducting Rutherford cables, and contain heaters to quickly force the transition to the normal conducting state in case of a quench, and hence reduce the hot spot temperature. In this paper the performance of the first three of these circuits is presented, focussing on quench detection, heater performance, operation of the cold bypass diodes, and magnet-to-magnet quench propagation. The results as measured on the entire circuits will be compared to the test results obtained during the reception tests of the individual magnets.
Authors: Arjan Verweij, S. Le Naour, V. Baggiolini, A. Ballarino, B. Bellesia, F. Bordry, A. Cantone, M. Casas Lino, A. Serra, C. Castillo Trello, N. Catalan-Lasheras, Zinour Charifoulline, Gert-Jan Coelingh, K. Dahlerup-Petersen, G. D'Angelo, R. Denz, S. Fehér, R. Flora, M. Gruwé, Verena Kain, B.A. Khomenko, G. Kirby, A. Macpherson, A. Marqueta Barbero, K.H. Mess, M. Modena, R. Mompo, Valerie Montabonnet, D. Nisbet, V. Parma, Mirko Pojer, L. Ponce, A. Raimondo, Stefano Redaelli, H. Reymond, David H. Richter, G. de Rijk, A. Rijllart, I. Romera Ramirez, R. Saban, S. Sanfilippo, R. Schmidt, A. Siemko, Matteo Solfaroli Camillocci, Yves Thurel, H.A. Thiessen, W Venturini-Delsolaro, A. Vergara Fernández, R. Wolf, Markus Zerlauth
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: National Eye Institute
OpenAlex ID: W16962363
