Work

Beam Loading Studies at CEBAF

Year: 1990
Type: article
Abstract: When the CEBAF accelerator operates at 200 {mu}A beam current, the superconducting cavities run with high beam loading. The CEBAF RF system (including the cavities, klystrons, and control systems) has been measured to obtain the response to low frequency current fluctuations and to obtain the transient response to rapid changes in the beam current. The data were collected both through RF tests where beam pulses are simulated by RF pulses and through beam tests. Both closed loop and open loop measurements were made, and the results are compared to detailed SPICE numerical simulations. It is concluded that CEBAF will operate with high control under a wide variety of loads.
Language: English
Open Access status: green
OpenAlex ID: W17901760
FWCI:
Cites:
Cited by: 1
Related to: 10