Work

Adequacy of project based financial management systems of small and medium construction enterprises in Botswana

Year: 2008
Type: dissertation
Abstract: The thesis documents findings of a study conducted to develop a project based financial \nmanagement system (PBFMS) whose role was viewed as a contributor to the successful \ndelivery of projects leading to improved financial performance of small and medium \nconstruction enterprise (SMCEs). In particular, the PBFMS was viewed as a facilitator \n{function) for the efficient and effective conduction of the strategic management, project \nplanning and control processes. Thus an adequate PBFMS was seen as one which, facilitates \nthe efficient and effective delivery of projects with a view to provide enhanced enterprise \nperformance. In pursuit of this aim, theory and practices relating to the development, operation \nand use of a PBFMS were investigated and analysed from both literature and field work \nleading to findings being reported in the thesis. In addition, the actual financial management \nsystems of SMCEs were investigated to determine the extent to which their attributes match \nthose of the proposed PBFMS model. \nThe motivation for embarking on the study was brought about by three aspects observed in \nBotswana. Firstly, was the frequently documented poor delivery of projects, that is, for a \nsustained period of time, projects were being delivered beyond stipulated times, above agreed \ncost, and below specified quality. In some worst scenarios, projects were being abandoned at \nvarious stages execution but before completion. Secondly, the investigation was also prompted \nby the frequent financial failures of enterprises that were being recorded in the construction \nindustry. Thirdly, the conduct of the proprietors of the construction enterprises was also \nfrequently circumspect, particularly in matters relating to financial management. \nThus in pursuing the study, a number of premises were made. Firstly, the financial \nmanagement systems of the SMCEs were considered inadequate to fulfil their functions, that \nis, they were incapable of facilitating the strategic management, project planning and control \nprocess. It was also speculated that management of SMCEs were not committed to the \nPBFMS i.e. they did not participate, get involved and did not comply with the policies \nregarding the planning, developing, and operation of financial management systems. As a \nresult, PBFMS were unable to play their role of facilitating to the successful delivery of \nprojects for improved contribution to the financial performance of SMCEs. The second \npremise was that financial models available are either too generic to guide SMCEs in financial \nmanagement matters or the strategic component is not linked to the operational plans to \nexecute the strategy. For those which are meant for construction enterprises, they normally \nprescribe practices for project planning and control without including the strategic element and \nvice versa. In essence there is a gap in each of the models available for use by the SMCEs. It is \nthe closing of this perceived gap in knowledge that the results of the thesis contribute in \nfinding a solution to the mentioned problem. Thus the study aimed at answering two research \nquestions: (i) Do SMCEs have adequate PBFMS that facilitate the effective delivery of \nprojects for enhanced financial performance? and (ii) Is there a relationship between the \nadequacy PBFMS and poor performance of SMCEs? To facilitate the answering of these two \nquestion two hypothesis were formulated namely: Hoi: The PBFMS of SMCEs are adequate \nto facilitate the delivery of projects; and Ho2: The adequacy of the PBFMS is positively \ncorrelated with the performance of SMCEs. To test the two questions a research process was \nplanned and executed in several steps. \nFirstly, a survey strategy using the questionnaire was selected as the most appropriate method \nto provide a snap shot of the existence of attributes of PBFMS and to investigate associated \npractices relating to their development and operation. The method was considered more \nappropriate and effective in gathering large data in a short space of time in line with the \ndoctoral time framework. Construction enterprises registered with Public Procurement and \nAsset Disposal Board (PPADB) for building and civil work in classes A, B, C and D were \nsurveyed. The internal quantity surveyor, estimator or accountant were requested to respond \non matters relating PBFMS on behalf of the SMCEs. The sampling frame from which the \nSMCEs considered for study were obtained from the two government departments which work \nclosely with PPADB, the Department of Building and Engineering Services (DBES) and \nDepartment of Roads (DR). The sample sizes for each group category (small and medium) \nwere determined using Krajcie and Morgan (1970) table. Stratified and systematic random \nsampling was used to select the identity of the members to form a sample fro study from the \nsampling frame. The second step was to design the questionnaire to probe the three aspects \nidentified as constituting the PBFMS namely the strategic management; project planning and \ncontrol; and management commitment. Essentially the questionnaire sought to investigate the knowledge, tools, techniques, practices, opinions and attitudes of those who design, develop, \noperate and use the PBFMS in the SMCEs. To ensure a high quality design, the questionnaire \nwas given to experts in the subject area to provide some comments on its suitability and was \nalso piloted on four enterprises. Data collected was analysed using mainly the SPSS software \nand involved application of various statistical techniques including cross-tabs, ratio analysis, ttests \nand correlational tests. \nA total of 101 completed questionnaires were received, made up of 55% and 46% small and \nmedium enterprises, respectively. The demographic profile of SMCEs confirmed some of the \nexpected results, for example, majority (59%) of the respondents were owner/managers \nconfirming the dominance of the owner in SMCEs. Majority of SMCEs (59%) were more than \n9 years old, with medium enterprises being more mature (60% older than 9 years) than the \nsmall sized enterprises (49% older than 9 years). Majority (56%) of SMCEs had 10 or more \nemployees, with medium sized enterprises having more employees (75% with 10 or more) \nthan the small sized enterprises (42% with 10 or more). SMCEs performed more of building \nwork alone (48%) than both building and civil work (48%) or maintenance (11%) and no \nenterprise performed civil work (0%) alone. Majority of SMCEs (65%) acted as main \ncontractors as opposed to sub-contractors, though as expected sub-contracting was seen more \nin small (20%) than medium (10%) enterprises. Lastly, the public sector (central and local \nauthorities) provided majority (65%) of the SMCEs jobs. However, if parastatals which are \nwholly owned by government were added, the public sector job market adds up to 73% \n(65%+8%). \nThe testing of the major two major hypothesis resulted in the following conclusion. The \nresults indicated that the first hypothesis was supported, that is, in a majority of SMCEs \noperating in Botswana the PBFMS were found to be adequate in facilitating the delivery \nof projects. The results were therefore not in agreement with the basic premise made at the \ncommencement of the study. In view of the finding, it suggests that SMCEs in Botswana have \nadequate systems that support the efficient and effective project planning and control. \nSecondly, management is committed to the 'welfare' of the PBFMS in terms of complying \nand supporting their development and operation. However, like any human endeavour, there are weaknesses in the PBFMS, for example, they were found inadequate in facilitating the \nstrategic management process, including lack of linking the process to the operational process \nin order to execute the strategy. They were also found weak in one of the most crucial process \nof project management; that of project control. \nThe second major investigation showed a weak link between the adequacy of a PBFMS \nand performance. Secondly, the results also indicated that the SMCEs which had \nadequate PBFMS performed better than their counterparts. The first results were not \nsurprising since the cause of poor performance were shown as three pillars (business \nenvironment, client/representatives and enterprise factors). However, the second results \nemphasise that SMCEs with adequate PBFMS posted better performance than their \ncounterparts with inadequate systems. In this way the role of PBFMS in contributing to better \nperformance was illustrated by the results. \nSome recommendations are proposed resulting from the findings and how to achieve a deeper \nunderstanding of the subject. Firstly, SMCEs should pay more attention to matters pertaining \nto strategic management to ensure a long-term view of their enterprises. Secondly, when a \nstrategic plan is developed, it must be implemented through operational plans as a means of \nexecuting the strategy. Thirdly, concerted effort should made in ensuring that the projects are \ncontrolled as it is the only way to achieve sustained profitability and satisfied customers. \nFourthly, as a way of providing a deeper understanding of the subject, it is suggested a \nlongitudinal study could be undertaken to yield a more encompassing investigation than a \ncross sectional study which captured only one business cycle of the industry (down turn). \nLastly, the study could be replicat
Language: English
Open Access status: green
OpenAlex ID: W1822072753
Cites: 146
Cited by: 8
Related to: 10