Generation of resource-constrained project scheduling problems with minimal and maximal time lags
Year: 1996
Type: book
Abstract: We describe a new problem generator for three different types of resource-constrained project scheduling problems with minimal and maximal time lags: the project duration problem, the resource leveling problem, and the resource investment problem. The cyclicity of the underlying project network requires special techniques for the parameterdriven generation of cycle structures. Two different approaches to the generation of cycle structures are presented: the direct method which adds backward arcs to an acyclic network and the contraction method which constructs isolated strong components which are then contracted to a single node and incorporated into an acyclic network. Efficient algorithms for the direct method and the contraction method are provided. The generation of the project's basic data as well as the resource demand and availability is based on ProGen by Kolisch et al. A computational experiment relating computation times for the solution of the project duration problem to sev...
DOI: 10.5445/ir/115296
Author: Schwindt, Christoph
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W196088982