Work

Injectivity and Productivity Estimation in Multiple Feed Geothermal Wells

Year: 1986
Type: article
Abstract: A method is presented which allows individual zone injectivity/productivity to be determined without downhole flow measurements. Mass balance in conjunction with the specific pressure change measured at selected points in the well is related to the individual zone injectivity/productivity which can then be used to estimate productive capacity. A sample staged completion test program is presented to obtain the maximum information from a completed well without discharge or use of the downhole flow meter.
Language: English
Field: Energy
Open Access status: green
OpenAlex ID: W1965739
FWCI:
Cites: 1
Cited by: 1
Related to: 10